Contractor · Electrical
Solar Electric Freedom, LLC
22 building permits since 2018 in Mesa city, AZ and Phoenix city, AZ — $1,311,987 in reported job value over 21 permits that state one.
- Building permits
- 22
- Reported job value
- $1.3M
- Active
- 2018–2026
- Latest permit
- May 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ16
- Phoenix city, AZ6
Permits by year
By issue date (application date where there is none).
048
7
2019202120232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 7 |
| 2022 | 3 |
| 2023 | 4 |
| 2024 | 2 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical16
- Solar15
- Battery storage13
- Electric meters2
Permit types
As the building departments classify them.
- Electrical16
- SE6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 4, 2026 | SE | — | Phoenix | $138,821 |
| Jul 9, 2024 | SE | — | Phoenix | $272,580 |
| Jan 29, 2024 | SE | — | Phoenix | $101,810 |
| Oct 12, 2023 | Electrical | THIS PERMIT IS ONLY FOR AN INSTALLATION OF ONE (1) FORTRESS PORWER EFLEX 5.4 LITHIUM BATTERY STORAGE. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIO | Mesa | $59,736 |
| Aug 21, 2023 | Electrical | THIS PERMIT IS ONLY FOR THE INSTALLATION OF FIVE (5) HUMLESS POWER BATTERIES. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM OR DERATE. CONTRACTOR AND THE SERVING | Mesa | $50,038 |
| Jul 24, 2023 | Electrical | Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requiremen | Mesa | $2,000 |
| May 22, 2023 | Electrical | THIS PERMIT IS ONLY FOR AN INSTALLATION OF (2) LION ENERGY 13.5Kw BATTERIES. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. BATTERIES TO BE INSTA | Mesa | $44,610 |
| Dec 19, 2022 | Electrical | 14.4 kW DC PV solar system expansion. One Lion Energy battery 13.5 kWH: 36 Talesun TD6G72M-400 panels: 1 Customer back-up panel ML0 225A CAT#HOM306DL225PGCVP: D | Mesa | $500 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued15
- Completed5
- Expired1
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.