Contractor · Electrical

RW SOLAR AND ELECTRIC

22 building permits since 2021 in Sacramento County, CA; Citrus Heights city, CA and Sacramento city, CA, across 2 counties — $1,433,114 in reported job value over 19 permits that state one.

Building permits
22
Reported job value
$1.4M
Active
2021–2025
Latest permit
Mar 15, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento County, CA11
  • Citrus Heights city, CA4
  • Sacramento city, CA4
  • Suisun City city, CA3

Permits by year

By issue date (application date where there is none).

07.515
12
20212022202320242025
View as table
YearPermits
20211
202212
20234
20241
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar12
  • Electrical10
  • Plumbing4
  • Water heaters4
  • Generators2
  • Roofing1

Permit types

As the building departments classify them.

  • MISR4
  • Single Family4
  • CBO3
  • COXX3
  • Electrical3
  • CBNC1
  • MHCR1
  • Other1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 15, 2025CBNCMAIN CASE FOR CBNC2021-00185 THROUGH CBNC2021-00192 Install new metal storage building in existing parking lot.Sacramento County$15,000
Mar 15, 2025RERC108, 131, or 132 inspection required prior to covering any work; Tear off old roof relay new roof.Sacramento County$18,000
Nov 14, 2024Single Family6.6kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will rSacramento$9,000
Nov 27, 2023ElectricalElectricalCitrus Heights City$45,000
Sep 22, 2023ElectricalElectricalCitrus Heights City$51,000
Jul 11, 2023COXXCH-01, Homeowner has an existing generator on property. We have added it to the one-line drawing for permit final purposes.Sacramento County—
Jul 11, 2023MISRInstalling a roof mounted PV solar system, CH-01, Homeowner has an existing generator on property. We have added it to the one-line drawing for permit final purSacramento County$37,900
Nov 29, 2022COXXCH-01 ADDED SOLAR PANEL AT NO COSTSacramento County—

Permit status

Where its permits stand, as the departments report them.

  • Issued12
  • Completed5
  • Finaled3
  • Expired1
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.