Contractor · General building
Robert Herrmann
22 building permits since 2017 in Sharon town, MA; Easton town, MA and Attleboro city, MA, across 2 counties — $259,390 in reported job value over 17 permits that state one.
- Building permits
- 22
- Reported job value
- $259.4K
- Active
- 2017–2025
- Latest permit
- Dec 7, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sharon town, MA14
- Easton town, MA4
- Attleboro city, MA1
- Norton town, MA1
- Foxborough town, MA1
- Walpole town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 3 |
| 2019 | 2 |
| 2020 | 2 |
| 2021 | 3 |
| 2022 | 3 |
| 2023 | 2 |
| 2024 | 1 |
| 2025 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels16
- Pools & hot tubs15
- Bathrooms13
- Windows & doors3
- Kitchens2
- Plumbing1
- Demolition1
Permit types
As the building departments classify them.
- Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)14
- RESI.6
- Building Permit-All One and Two Family1
- Building Permit - Residential1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 7, 2025 | Building Permit - Residential | Remodel existing master bathroom | Norton Town | $14,600 |
| Sep 8, 2025 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Modify existing deck Remove existing decking and handrail, square off deck which currently has a 45 degree angle and install new decking and handrail | Sharon Town | $17,750 |
| Jun 17, 2025 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Remodel existing kids bath, all fixtures to be swapped out but remain where they are, new tile on floor and shower walls | Sharon Town | $6,500 |
| May 6, 2025 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Simple swap out ,Remove existing fixtures and tile and install new | Sharon Town | $10,000 |
| Mar 4, 2025 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Remodel existing bathroom, new tile on shower walls, new tile on floor and new vanity | Sharon Town | $9,000 |
| May 8, 2024 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Finish basement into a play area, workout room and TV area with a bathroom. NO BEDROOMS / SLEEPING FACILITES / COOKING FACITITIES ALLOWED. | Sharon Town | $40,000 |
| Jul 19, 2023 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Finish 840 Sq ft of basement area. Frame walls around perimeter of basement and closet under stairs as well as half bath in corner NO SLEEPING AREA / BEDROOM AL | Sharon Town | $26,630 |
| Feb 22, 2023 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Remodel Existing Bathroom, Remove Tub and Install New Shower. Bathroom Window to be Tempered. | Sharon Town | $14,300 |
Permit status
Where its permits stand, as the departments report them.
- Completed16
- C/o issued3
- Issued1
- Expired1
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.