Contractor · HVAC
Robert Chase
22 building permits since 2015 in Grafton town, MA; Millbury town, MA and Dartmouth town, MA, across 6 counties — $543,627 in reported job value over 20 permits that state one.
- Building permits
- 22
- Reported job value
- $543.6K
- Active
- 2015–2026
- Latest permit
- Apr 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Grafton town, MA4
- Millbury town, MA3
- Dartmouth town, MA2
- Wareham town, MA2
- Webster town, MA2
- Methuen city, MA1
- Hudson town, MA1
- Quincy city, MA1
- Randolph Town city, MA1
- Hanover town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 1 |
| 2017 | 1 |
| 2021 | 3 |
| 2022 | 1 |
| 2023 | 5 |
| 2024 | 4 |
| 2025 | 5 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC16
- Heat pumps9
- Electrical4
- Bathrooms3
- Gas2
- Kitchens2
- Remodels2
- Plumbing2
- Windows & doors1
Permit types
As the building departments classify them.
- Mechanical/Sheet Metal Permit4
- Sheet Metal / Mechanical Permit3
- Building Permit2
- Mechanical Permit2
- Residential Building Permit2
- Building Permit Application1
- Building Permit - Residential1
- Building Permit - Short Form1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 28, 2026 | Building Permit - Residential | Installation of a Bryant air conditioning system through the attic using sheet metal supply and return duct and flxible insulated branch lines. | Auburn Town | $16,452 |
| Dec 1, 2025 | Mechanical Permit | Installation of a Mitsubishi 42,000 btu heat pump with 4 heads and a 150 cfm ERV venting the two bathrooms. | Webster Town | $31,000 |
| Sep 9, 2025 | Sign Permit | We are using the same sign. Harvey Signs, who did the sign originally, is only changing the lettering on it. | Methuen Town City | — |
| Aug 27, 2025 | Mechanical/Sheet Metal Permit | INSTALLATION OF NEW MECHANICAL SYSTEM HEATING & COOLING | Grafton Town | $34,000 |
| Jul 1, 2025 | Sheet Metal / Mechanical Permit | Installation of a Mitsubishi mini-split system to heat and cool the home | Millbury Town | $29,500 |
| Mar 13, 2025 | Sheet Metal Permit | Installation of a Mitsubishi multi-zone heat pump with an 18,000 btu air handler servicing the first floor and 3 6,000 btu ceiling recessed mini-splits for the | Dudley Town | $31,000 |
| Aug 20, 2024 | Mechanical Permit | Installation of a Mitsubishi multi-zone heat pump system with six indoor units.One unit in each second floor bedroom (2), Two ceiling recessed units in the kitc | Webster Town | $33,000 |
| Jul 30, 2024 | Residential Building Permit | Convert one bedroom house into three bedroom house. Existing layout to remain the same, Just changing the current uses of rooms. Den being converted into a bedr | Dartmouth Town | $15,000 |
Permit status
Where its permits stand, as the departments report them.
- Active13
- Completed6
- Stop work ordered2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.