Contractor · General building

RISE CONSTRUCTION

22 building permits since 2025 in Citrus County, FL.

Building permits
22
Reported job value
—
Active
2025–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Citrus County, FL22

Permits by year

By issue date (application date where there is none).

07.515
14
20252026*
* 2026 is year to date.
View as table
YearPermits
20258
2026 (YTD)14

Type of work

Permits describing each kind of work; one permit can cover several.

  • New construction14
  • Electrical12
  • HVAC7
  • Plumbing7
  • Accessory dwelling units3
  • Demolition2
  • Electric meters2
  • Gas1
  • Grading & excavation1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Residential12
  • Accessory Structure6
  • Concrete2
  • Demolition2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026ResidentialBLD202511371 INFOR PERMIT New SFD with attached breezeway and Garage to include electric, plumbing, and HVAC. Existing Well permit #958749. Flood Zone A/AE/X, bCitrus County—
Oct 22, 2026ConcreteNew Circular Driveway 4,147 SQ FT and 279 SQ FT walkway at rear of SFD ** NOC REQUIRED ** SITEPLAN APPROVED FOR NEW CIRCULAR DRIVEWAY 4,147 SQ FT AND NEW SIDEWACitrus County—
Oct 6, 2026Accessory StructureNew 36'W X 40'D Pole Barn with slab and new meter/panel. Flood Zone AE/X. Lots 15B and 16 Unity of Title Affidavit recorded. SFD permit BLD2510-1403 in progressCitrus County—
Aug 26, 2026Residential** PLEASE DO NOT SCHEDULE INSPECTIONS UNTIL IMPACT FEES ARE PAID ** New SFD with Plumbing, Electrical and HVAC. ** NOC AND PRODUCT APPROVAL REQUIRED TO BE ON SICitrus County—
Jul 27, 2026Accessory StructureNew ADU with electrical, plumbing, and HVAC. / NOC ON FILE FOR NEW REISDENCE AND ACCESSORY DWELLING IN OR BK:3698 PG:722 / **SITE APPROVED FOR NEW ACCESSORY DWECitrus County—
Jul 27, 2026ResidentialNew SFD with Electric, Plumbing and HVAC *NOC FOR NEW RESIDENCE AND ACCESSORY DWELLING IN OR BK 3698/722 NOC MUST BE PLACED ON JOBSITE * * ADU PERMIT BLD2606-15Citrus County—
Jul 21, 2026ResidentialNEW SFD WITH LP GAS ** SEPERATE TANK PERMIT REQUIRED FO FOR LP TANK ** RECORDED NOC REQUIRED TO BE ON-SITE FOR INSPECTOR FOR NEW SFD IN OR BK: 3694 PG: 2404 ** Citrus County—
Jun 12, 2026ResidentialREPLACEMENT- New SFD with HVAC Electrical, Plumbing. Flood Zone X (SWMP included) / NOC FOR SINGLE FAMILY RESIDENCE IN OR BK:3671/PG:2283 / SITE APPROVED FOR NECitrus County—

Permit status

Where its permits stand, as the departments report them.

  • Issued10
  • Closed6
  • Expired4
  • Cancelled2

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.