Contractor · Plumbing
PRIORITY INSPECTION NOW LLC
22 building permits since 2025 in Citrus County, FL and Orlando city, FL, across 2 counties — $6,138 in reported job value over 2 permits that state one.
- Building permits
- 22
- Reported job value
- $6.1K
- Active
- 2025–2026
- Latest permit
- Mar 25, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Citrus County, FL20
- Orlando city, FL2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 18 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Gas16
- Plumbing15
- Generators12
- HVAC4
- Electrical2
- Kitchens1
- Heat pumps1
- Windows & doors1
- Water heaters1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Tank15
- Mechanical4
- Building Permit2
- Door and Window Replacement1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 25, 2026 | Tank | LP GAS LINE TO GENERATOR FROM EXISTING LP LINE | Citrus County | — |
| Mar 23, 2026 | Tank | RELOCATE ABOVE GROUND 120G TANK TO LEFT SIDE OF HOUSE TYING INTO EXISTING 120G ABOVE GROUND TANK. LP GAS LINE FROM EXISTING LP GAS LINE TO EXISTING LINE AT HOUS | Citrus County | — |
| Mar 18, 2026 | Tank | BURY 250G TANK GAS LINE TO WATER HEATER (1), WATER HEATER (2), COOK TOP, FIREPLACE , AND GRILL *TANK CHANGED LOCATION TO FRONT YARD* | Citrus County | — |
| Jan 21, 2026 | Tank | ABOVE GORUND 60G TANK GAS LINE TO RANGE | Citrus County | — |
| Dec 16, 2025 | Tank | BURY 250G TANK GAS LINE TO GENERATOR ** GENERATOR PERMIT BLD2510-1302 ** SITEPLAN WAIVED - TANK LOCATION MEETS REQUIRED SETBACKS ** | Citrus County | — |
| Dec 2, 2025 | Tank | LP GAS LINE FROM EXISTING TANK TO GENERATOR , EXISTING POOL HEATER, EXISTING GRILL , GRILL , SMOKER | Citrus County | — |
| Nov 25, 2025 | Mechanical | Replaced existing HVAC split system with new HVAC split system. Same for same. | Citrus County | — |
| Nov 12, 2025 | Mechanical | Installing new 12ft commercial hood in kitchen. Installing 6ft commercial hood in dining room.*NOC IN OR BK3618 PG1928**SEPERATE PERMIT REQUIRED FOR ELECTRICAL | Citrus County | — |
Permit status
Where its permits stand, as the departments report them.
- Closed19
- Finaled2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.