Contractor · Plumbing
Marbledale Plumbing & Heating L.L.C.
22 building permits since 2022 in New Milford town, CT; Brookfield town, CT and Winchester town, CT, across 2 counties — $106,699 in reported job value over 22 permits that state one.
- Building permits
- 22
- Reported job value
- $106.7K
- Active
- 2022–2026
- Latest permit
- Oct 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- New Milford town, CT17
- Brookfield town, CT2
- Winchester town, CT1
- New Fairfield town, CT1
- Wilton town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 1 |
| 2023 | 4 |
| 2024 | 4 |
| 2025 | 4 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing22
- HVAC9
- Gas8
- Bathrooms8
- Water heaters7
- Generators2
- Electrical2
- Kitchens1
- Remodels1
- Heat pumps1
Permit types
As the building departments classify them.
- Plumbing Permit11
- Gas Permit4
- Mechanical Permit3
- Building Permit1
- Building Permit (No Trades)1
- Mechanical Permit Application (HVAC, Heat, Ventilation, Air Conditioning)1
- Plumbing/Gas Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 26, 2026 | Plumbing Permit | Install (2) customer provided sinks and faucets. Secure sinks to the wall. Join to existing waste and water piping in the wall. Add air admittance valve to plum | Brookfield Town | $1,232 |
| Sep 8, 2026 | Plumbing Permit | Extend baseboard heat. Plumb for one shower and one freestanding tub | New Milford Town | $4,000 |
| Aug 26, 2026 | Plumbing/Gas Permit | Plumb custoemr supplied materials at wet bar. Install a new frost proof hsoe bib. Plumb(1) lavatory, (1)shower valve, and (1) toilet with customer supplied fixt | Wilton Town | $11,550 |
| Jul 1, 2026 | Plumbing Permit | Provide and install all necessary plumbing for a basement bathroom consisting of: (1) sewage ejector pump, (1) premade steam shower surround, (1) toilet, and (1 | New Milford Town | $6,500 |
| May 20, 2026 | Building Permit | Add shower to existing half bathroom on the first floor. Move toilet to accomodate new shower | New Milford Town | $2,500 |
| Apr 27, 2026 | Mechanical Permit Application (HVAC, Heat, Ventilation, Air Conditioning) | Provide and install a new Buderus G115/4 boiler complete with a Reillo burner, and all related materials and fittings including but not limited to auto feeder/b | New Fairfield Town | $14,604 |
| Apr 7, 2026 | Plumbing Permit | Add a shower to existing 1/2 bathroom onthe first floor. Move toilet to accommodate new shower | New Milford Town | $2,500 |
| Mar 26, 2026 | Mechanical Permit | Provide and install a St Roch 5 Section Boiler (158k BTU output) with CArlin burner and all related boiler components (circulator, bfeeder/backflow preventer, e | New Milford Town | $16,500 |
Permit status
Where its permits stand, as the departments report them.
- Active11
- Completed11
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.