Contractor · Electrical

LIGHTWAVE SOLAR, LLC (E000)

22 building permits since 2020 in Memphis city, TN; Arlington town, TN and Shelby County, TN — $693,063 in reported job value over 12 permits that state one.

Building permits
22
Reported job value
$693.1K
Active
2020–2026
Latest permit
Oct 1, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Memphis city, TN15
  • Arlington town, TN3
  • Shelby County, TN3
  • Millington city, TN1

Permits by year

By issue date (application date where there is none).

036
6
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20201
20214
20222
20234
20244
20256
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical22
  • Solar19
  • Battery storage10
  • Roofing1
  • Generators1
  • Electric meters1

Permit types

As the building departments classify them.

  • RESIDENTIAL ELECTRICAL PERMIT15
  • COMMERCIAL ELECTRICAL PERMIT7

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 1, 2026RESIDENTIAL ELECTRICAL PERMITSolar w/ BatteriesMemphis city$40,439
Oct 2, 2025COMMERCIAL ELECTRICAL PERMITLightWave Solar proposes installation of an 21kW roof-mount solar pv system consisting of: (75) SILFAB 500W Solar Modules; (51) SolarEdge S1201 Optimizers; and Arlington town—
Jun 9, 2025COMMERCIAL ELECTRICAL PERMITLightWave Solar proposes installation of an 65kW roof-mount solar pv system consisting of: (130) SILFAB 500W Solar Modules; (66) SolarEdge S1202 Optimizers; andArlington town—
Jun 9, 2025COMMERCIAL ELECTRICAL PERMITLightWave Solar proposes installation of an 21kW roof-mount solar pv system consisting of: (42) SILFAB 500W Solar Modules; (42) SolarEdge S500B Optimizers; and Arlington town—
Apr 1, 2025RESIDENTIAL ELECTRICAL PERMITLightWave Solar proposes installation of a Tesla Powerwall 3 battery storage unit to an existing 3.95kW solar pv system.Memphis city$21,563
Mar 24, 2025COMMERCIAL ELECTRICAL PERMITLightWave Solar proposes installation of a 73.78kW ground mount solar pv system consisting of: (124) Hanwha QCELL 595W Solar Modules; and (1) 60kW CPS SCA60KTL-Memphis city—
Jan 29, 2025COMMERCIAL ELECTRICAL PERMITLightWave Solar to install additional inverter and battery storage unit to existing solar pv system; consisting of the following: (1) 30kW Solark 30k-3P-208 InvMillington city—
Apr 24, 2024RESIDENTIAL ELECTRICAL PERMITLightWave Solar plans to re-wire the existing meter socket to conform with MLGW's request to switch the load with the line side from it's current position.Memphis city$500

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

LIGHTWAVE SOLAR, LLC (E000) — Building Permits & Contractor Profile | Buildstats