Contractor · Electrical

HUA ELECTRIC & HVAC

22 building permits since 2024 in Sacramento city, CA; Sacramento County, CA and Elk Grove city, CA — $279,106 in reported job value over 22 permits that state one.

Building permits
22
Reported job value
$279.1K
Active
2024–2026
Latest permit
Jun 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento city, CA20
  • Sacramento County, CA1
  • Elk Grove city, CA1

Permits by year

By issue date (application date where there is none).

0510
10
202420252026*
* 2026 is year to date.
View as table
YearPermits
202410
20256
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical17
  • Electric meters9
  • Remodels2
  • Roofing1

Permit types

As the building departments classify them.

  • Single Family8
  • Apts 5+5
  • Duplex2
  • Industrial2
  • Apts 3-41
  • Churches1
  • MISC1
  • Retail Store1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 16, 2026ChurchesEPC - Replace end of life meter panel with new 400A meter panel. provide electrical connection for outdoor freezer & forklift charger. SEE REVISION COM-2616307:Sacramento$12,500
May 19, 2026IndustrialEPC - Replace existing service with 3000-amp, 480v serviceSacramento$100,000
May 9, 2026Single FamilyE-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement.Sacramento$5,000
Apr 16, 2026Single FamilyE-Permit: existing panel 100 Amps - Overhead service, new main panel 100 Amps, New Install weather head/masthead work, main breaker replacement.Sacramento$1,650
Mar 20, 2026MISCVandalized Seals and rings were found to have been cut at the location. A reconnection is needed at the Main house Panel. An inspection is required for the housSacramento County$200
Feb 2, 2026Apts 5+EPC - Replace existing electrical meter panel with new multi-meter panel at the same location. Electrical work only. SEE REVISION 2613359: Change overhead feedeSacramento$12,500
Nov 21, 2025Single FamilyReplace end of 100A meter panel with new 200A meter panel at the same location. AA: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New InsSacramento$3,500
Oct 29, 2025Apts 3-4EPC - Replace existing end of life meter panel with new 200A meter panel at a different location.Sacramento$5,000

Permit status

Where its permits stand, as the departments report them.

  • Issued20
  • Closed1
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.