Contractor · Electrical

GUARANTEED ELECTRIC

22 building permits since 2012 in Sarasota city, FL and Hardee County, FL, across 2 counties — $71,146 in reported job value over 22 permits that state one.

Building permits
22
Reported job value
$71.1K
Active
2012–2024
Latest permit
Oct 29, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sarasota city, FL21
  • Hardee County, FL1

Permits by year

By issue date (application date where there is none).

02.55
5
201220142016201820212024
View as table
YearPermits
20121
20133
20142
20153
20165
20171
20182
20201
20211
20231
20242

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical16
  • Electric meters6
  • Roofing3
  • HVAC2
  • Generators2
  • Pools & hot tubs2
  • Gas1
  • Demolition1

Permit types

As the building departments classify them.

  • Building and Zoning16
  • Over the Counter Permit5
  • Used Manufactured Home1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2024Over the Counter PermitHurricane Milton damage repair - Replace damaged riser, meter wire, grounding system for 100amp, added surge protector and emergency disconnectSarasota City$1,000
Oct 22, 2024Over the Counter PermitHURRICANE MILTON Emergency Service change for 200 amp overhead system, Change out meter and replacing the riser that ripped off in hurricane, replace weather-heSarasota City$1,500
Feb 28, 2023Over the Counter PermitCHANGE OUT OF OLD METER CAN AND PANEL DUE TO AGE AND CONDITION OF PANEL SERVICE CHANGESarasota City$4,739
Apr 5, 2021Over the Counter PermitInstallation of a new service 320 meter can, (2) transfer switches and refeeding of existing pool equipment and existing house main panel.Sarasota City$14,377
Mar 10, 2020Over the Counter PermitDEMO ALL ELECTRICAL ON TH ROOF SO THAT NEW ROOF CAN BE INSTALLED - NO REINSTALLATIONSarasota City$2,000
Oct 24, 2018Building and ZoningINSTALLATION OF GENERATOR AND TRANSFER SWITCH WITH GASSarasota City$16,471
Jun 14, 2018Building and ZoningINSTALL TRANSFER SWITCH FOR FUTURE INSTALL OF GENERATOR TRANSFER SWITCH ON EAST SIDE OF HOUSE, NEXT TO EXISTING METERSarasota City$1,800
Aug 3, 2017Used Manufactured Home25x42 Used Manufactured home Power PRECOHardee County$4,200

Permit status

Where its permits stand, as the departments report them.

  • Closed21
  • Void1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.