Dani Racine
22 building permits since 2022 in Talbot County, MD — $981,512 in reported job value over 19 permits that state one.
- Building permits
- 22
- Reported job value
- $981.5K
- Active
- 2022–2025
- Latest permit
- Dec 9, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Talbot County, MD22
Permits by year
By issue date (application date where there is none).
012.525
21
20222025
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 21 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing15
Permit types
As the building departments classify them.
- Marine Construction / Shoreline Stabilization Permit22
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 9, 2025 | Marine Construction / Shoreline Stabilization Permit | This project proposes to perform general maintenance on 118 linear feet of existing riprap, not to extend further into mean high water. | Talbot County | $20,000 |
| Aug 5, 2022 | Marine Construction / Shoreline Stabilization Permit | This project proposes to replace 120 linear feet of bulkhead within a maximum of 18" channelward of the existing bulkhead. | Talbot County | $35,000 |
| Jul 20, 2022 | Marine Construction / Shoreline Stabilization Permit | This project proposes to stabilize 155 linear feet of eroding shoreline with a living shoreline. | Talbot County | $50,000 |
| Jul 19, 2022 | Marine Construction / Shoreline Stabilization Permit | Construct a 140-foot long by 6-foot wide timber pier with a 20-foot wide by 10-foot long “L” head platform, a 15-foot long by 3-foot wide finger pier, one 15-fo | Talbot County | $232,200 |
| Jul 8, 2022 | Marine Construction / Shoreline Stabilization Permit | This project proposes to construct a new 130 ft x 6 ft pier with a 15 ft x 6 ft walkway over riprap, 20 ft x10 ft platform, boat lift, 4 jet ski lifts and 4 moo | Talbot County | $27,222 |
| Jun 28, 2022 | Marine Construction / Shoreline Stabilization Permit | Construct 375 feet of riprap revetment within a maximum of 10 feet channelward of the mean high water line, pursuant to MDE General Tidal Wetlands License No. 2 | Talbot County | $50,000 |
| Jun 28, 2022 | Marine Construction / Shoreline Stabilization Permit | In-kind replacement of a 182 foot x 6 foot wide pier, 5 mooring piles, and 1 personal watercraft lift, with all associated structures extending a maximum of 171 | Talbot County | $54,128 |
| May 20, 2022 | Marine Construction / Shoreline Stabilization Permit | Remove an existing pier and associated structures. Construct a 90-foot long by 6-foot wide pier, a 10-foot long by 20-foot wide platform, a 15-foot long by 15-f | Talbot County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed16
- Stop work ordered5
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.