Contractor · Electrical
Lindita Donahue
294 building permits since 2016 in Stamford town, CT; Glastonbury town, CT and Ridgefield town, CT, across 6 counties — $5,313,999 in reported job value over 255 permits that state one.
- Building permits
- 294
- Reported job value
- $5.3M
- Active
- 2016–2026
- Latest permit
- Sep 22, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT81
- Glastonbury town, CT39
- Ridgefield town, CT35
- Stratford town, CT27
- Bristol town, CT21
- South Windsor town, CT18
- New Fairfield town, CT18
- Redding town, CT15
- New Milford town, CT8
- Darien town, CT7
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 1 |
| 2018 | 40 |
| 2019 | 43 |
| 2020 | 73 |
| 2021 | 29 |
| 2022 | 31 |
| 2023 | 33 |
| 2024 | 19 |
| 2026 (YTD) | 25 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar224
- Electrical214
- Battery storage89
- Roofing59
- EV chargers32
- Generators3
- Electric meters3
- Remodels2
- Demolition1
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical Permit144
- Building Permit34
- Solar PV Electrical Permit23
- A Residential Building Application & One and Two Family Dwelling Only (for apt's or condo use Commercial Bldg)21
- Electrical Permit General18
- Photovoltaic Solar Electrical Permit14
- Solar PV12
- Solar Permit Application11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 22, 2026 | Electrical Permit | Remove and reinstall solar panels once homeowner has completed re-roof work | Darien Town | $1,000 |
| Aug 27, 2026 | Electrical Permit | Install (4) Tesla Energy Storage System (54 kwh) | South Windsor Town | $23,700 |
| Aug 24, 2026 | Electrical Permit | Temporary remove solar panels and reinstall them back once homeowner has completed re-roof work | Bristol Town | $500 |
| Aug 21, 2026 | Electrical Permit | Temporary remove solar panels and reinstall them back once homeowner has completed re-roof work | Bristol Town | $500 |
| Aug 21, 2026 | Electrical Permit | Install (1) Tesla Energy Storage System (13.5 kwh) | Stamford Town | $12,507 |
| Aug 21, 2026 | Electrical Permit | Install (16) roof mounted solar panels (6.72 kw) and (1) Tesla wall connector EV charger | Ridgefield Town | $21,127 |
| Aug 18, 2026 | Electrical Permit and Voice/Data -NOT TO BE USED FOR GENERATORS OR FIRE ALARMS | Install (2) Tesla Energy Storage System (27 kwh) | Wilton Town | $12,820 |
| Aug 10, 2026 | Stonington Electrical Permit | Install (4) Tesla Energy Storage System (54 kwh) and concrete pad | Stonington Town | $25,040 |
Permit status
Where its permits stand, as the departments report them.
- Completed180
- Active109
- Stop work ordered5
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.