Contractor · Roofing
Alexander Green
22 building permits since 2021 in Needham town, MA; Lakeville town, MA and Attleboro city, MA, across 6 counties — $2,611,116 in reported job value over 20 permits that state one.
- Building permits
- 22
- Reported job value
- $2.6M
- Active
- 2021–2026
- Latest permit
- Jul 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Needham town, MA7
- Lakeville town, MA4
- Attleboro city, MA2
- Medfield town, MA2
- Quincy city, MA2
- Swampscott town, MA1
- Natick town, MA1
- Stoneham town, MA1
- Bridgewater Town city, MA1
- Boston city, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 2 |
| 2022 | 3 |
| 2023 | 8 |
| 2024 | 4 |
| 2025 | 3 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing11
- Remodels7
- Windows & doors1
Permit types
As the building departments classify them.
- Building Permit - Commercial Projects7
- Building Permit - Commercial5
- Building Permit Application2
- RESI.2
- Building Permit - Application1
- Building Permit - Commercial and Other than One and Two Family Dwellings1
- COMM.1
- Commercial Building Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 20, 2026 | Commercial Building Permit | Remove existing low slope roofing and replace with new EPDM roofing and insulation PERMIT REQUIRED TO BE ON SITE FOR INSPECTIONS CALL FOR FINAL INSPECTION | Medfield Town | $57,700 |
| Mar 17, 2026 | Building Permit - Commercial and Other than One and Two Family Dwellings | Install new roofing over exsiting tar and gravel roof system on main library building. Remove small section of slate roofing and replace with metal. Per stamped | Stoneham Town | $294,680 |
| Nov 26, 2025 | Residential Building Permit | REMOVE EXISTING DECK AND REPLACE WITH A 14'X25' DECK WITH 2X10 FRAMING 12" ON CENTER WITH COMPOSUTE DECKING AND PVC RAILINGS. PERMIT REQUIRED TO BE ON SITE FOR | Medfield Town | $30,000 |
| Sep 25, 2025 | RESI. | Remove existing deck and replace with new deck per drawing. | Bridgewater Town City | $8,800 |
| May 2, 2025 | Building Permit Application | Remove existing asphalt roofing and replace with new. Remove existing EPDM roofing and replace with TPO. Delete dormers and reconfigure an existing dormer to ac | Quincy City | $192,700 |
| Nov 4, 2024 | Building Permit - Commercial | Remove existing EPDM roof and insulation and replace with new TPO roof and insulation, including 1/4" tapered system | Lakeville Town | $524,685 |
| Jul 11, 2024 | Building Permit - Commercial | Replace shingle roofing on three areas of building. Rear shed, left stairwell, front portico | Lakeville Town | $5,984 |
| Jun 4, 2024 | Building Permit - Commercial | Replace EPDM roof with TPO roof | Lakeville Town | $64,700 |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Active3
- Finaled2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.