Contractor · Electrical
Stephen Garner
23 building permits since 2022 in Lenoir County, NC and Greene County, NC, across 2 counties.
- Building permits
- 23
- Reported job value
- —
- Active
- 2022–2026
- Latest permit
- Oct 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Lenoir County, NC20
- Greene County, NC3
Permits by year
By issue date (application date where there is none).
048
8
2022202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 2 |
| 2024 | 8 |
| 2025 | 8 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical23
- HVAC5
- Generators3
- Electric meters3
- Additions1
- Heat pumps1
Permit types
As the building departments classify them.
- Electric Permit Application20
- Electrical Permit Application3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 26, 2026 | Electric Permit Application | urgent - residence with no power issues with existing double meter base causing no power in residence. changing out double meter base and adding service groundi | Lenoir County | — |
| Sep 28, 2026 | Electrical Permit Application | 200a subpanel to feed hvac, lights & recs for residential accessory structure addition. Tied to bldg permit #RBP-26-118 | Greene County | — |
| Jun 9, 2026 | Electric Permit Application | Install 22kw generator with (2) 200a transfer switches. | Lenoir County | — |
| Mar 30, 2026 | Electric Permit Application | Relocate lights, switches & receptacles as needed for wall & ceiling modifications. | Lenoir County | — |
| Mar 16, 2026 | Electric Permit Application | New 200a service, outside panel, inside panel, wiring to lights, recs, hvac. | Lenoir County | — |
| Nov 13, 2025 | Electric Permit Application | Replacing bad 200a post service for mobile home | Lenoir County | — |
| Aug 11, 2025 | Electric Permit Application | Install 60a feed from existing service to new pre-wired shop. Install circuit to new mini split. | Lenoir County | — |
| Jun 25, 2025 | Electric Permit Application | add light, switch & receptacle in new closet, tie into existing circuit. | Lenoir County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed18
- Active5
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.