Contractor · HVAC
Richard Ciejka
23 building permits since 2019 in Webster town, MA; Dudley town, MA and Grafton town, MA — $454,543 in reported job value over 23 permits that state one.
- Building permits
- 23
- Reported job value
- $454.5K
- Active
- 2019–2026
- Latest permit
- Aug 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Webster town, MA12
- Dudley town, MA6
- Grafton town, MA2
- Sutton town, MA2
- Millbury town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2022 | 2 |
| 2023 | 4 |
| 2024 | 9 |
| 2025 | 2 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC23
- Electrical8
- Gas7
- Bathrooms3
- Heat pumps3
- Remodels2
- Kitchens1
- Roofing1
- New construction1
Permit types
As the building departments classify them.
- Mechanical Permit11
- Sheet Metal Permit6
- Mechanical/Sheet Metal Permit2
- Sheet Metal & Mechanical Permit2
- Building Permit - Residential Projects1
- Sheet Metal / Mechanical Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 14, 2026 | Sheet Metal & Mechanical Permit | Scope of Work: Install one Mitsubishi 12,000 BTU ductless mini-split heat pump to provide heating and cooling for the finished basement open recreation area. In | Sutton Town | $6,000 |
| Jul 20, 2026 | Mechanical Permit | Remove existing gas furnace and install one (1) new York TM9V040A10MP12C 40,000 BTU, 96% AFUE two-stage gas furnace with variable-speed ECM blower. Install new | Webster Town | $18,127 |
| Apr 21, 2026 | Mechanical Permit | Installing Ducted Heat pump in basement with electric back up heat strip. Supply/return registers in every room. Ducts will be seakled and insulated. Also insta | Webster Town | $25,000 |
| Apr 9, 2025 | Mechanical Permit | installation includes RUUD 95% 40kGas Furnace with constant torque motor. Furnace will be located in basement Along with zone 1(1stFloor) trunk duct feeding roo | Webster Town | $18,000 |
| Mar 27, 2025 | Sheet Metal Permit | one furnace located in basement set up with two zones.Supply/return trunks will run from basement to attic space. First floor supply/return trunk will run along | Dudley Town | $19,000 |
| Dec 12, 2024 | Mechanical Permit | Equipment used will be RUUD R95T 42K Btu Propane converted Furnace.Furnace will be located in basement set up with two zones. Second floor will be its own zone | Webster Town | $21,000 |
| Jul 23, 2024 | Sheet Metal & Mechanical Permit | BOSCH condenser, cased coil and 2stage Propane Furnace with ECM Motor. This two zone system will have back up Furnace that will activate when heat pump cant kee | Sutton Town | $31,290 |
| May 14, 2024 | Mechanical/Sheet Metal Permit | INSTALLATION OF NEW MECHANICAL SYSTEM COOLING | Grafton Town | $15,936 |
Permit status
Where its permits stand, as the departments report them.
- Completed14
- Active9
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.