Contractor · Electrical
RENEWABLE SERVICES LLC
23 building permits since 2024 in Chesterfield County, VA; Albemarle County, VA and Gloucester County, VA, across 5 counties — $253,622 in reported job value over 21 permits that state one.
- Building permits
- 23
- Reported job value
- $253.6K
- Active
- 2024–2026
- Latest permit
- Aug 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Chesterfield County, VA14
- Albemarle County, VA3
- Gloucester County, VA2
- Petersburg city, VA2
- Washington County, VA1
- South Hill town, VA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 10 |
| 2025 | 7 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical21
- Solar16
- Battery storage8
- EV chargers4
- Additions2
Permit types
As the building departments classify them.
- Residential Electrical14
- Electrical3
- Residential - Electric3
- Permit Issue2
- ELECTRIC1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 13, 2026 | Electrical | Electric Vehicle Charger | Washington County | $1,000 |
| Jul 17, 2026 | Residential - Electric | Installation of a Tesla Energy Storage System, a Tesla Electrical Vehicle Charger, and a main panel upgrade to a SPAN panel with a 200A breaker. | Albemarle County | $28,150 |
| Jun 29, 2026 | Residential Electrical | Electrical wiring for solar panel installation - 10.68 kW system size. | Chesterfield County | $750 |
| May 18, 2026 | Residential Electrical | Wiring related to the addition of 5 modules to an existing residential pv solar system | Chesterfield County | $750 |
| May 6, 2026 | Residential Electrical | Installing 1 EV charger (Tesla Wall Connector). | Chesterfield County | $2,000 |
| Apr 27, 2026 | Residential Electrical | Electrical wiring for the installation of an 11.44kW DC residential, roof mounted, grid-tied, pv solar system. | Chesterfield County | $750 |
| Dec 23, 2025 | Residential Electrical | Electrical wiring for the installation of one 13.5 kwh energy storage system that will be tied to the existing solar pv system. | Chesterfield County | $16,800 |
| Oct 22, 2025 | Residential - Electric | Installation of a Tesla Powerwall 3 energy storage system, a Tesla electrical vehicle charger, and a main panel upgrade to a SPAN panel. | Albemarle County | $28,150 |
Permit status
Where its permits stand, as the departments report them.
- Issued15
- Not stated3
- Approved2
- Active1
- Expired1
- C/o issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.