Contractor · General building
ochs, peter r.
23 building permits since 2008 in Falmouth town, MA.
- Building permits
- 23
- Reported job value
- —
- Active
- 2008–2019
- Latest permit
- Sep 26, 2019
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Falmouth town, MA23
Permits by year
By issue date (application date where there is none).
036
6
200920112013201520172019
View as tableHide table
| Year | Permits |
|---|---|
| 2008 | 1 |
| 2009 | 1 |
| 2010 | 2 |
| 2011 | 2 |
| 2012 | 6 |
| 2013 | 2 |
| 2014 | 1 |
| 2015 | 1 |
| 2016 | 2 |
| 2017 | 1 |
| 2018 | 2 |
| 2019 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms9
- Windows & doors6
- Additions5
- Demolition3
- HVAC2
- Kitchens2
- Roofing2
- Remodels1
- Plumbing1
- Heat pumps1
Permit types
As the building departments classify them.
- RESI.17
- REP4
- SFA2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 26, 2019 | RESI. | rear addition for new stairway, extend rear deck, front addition and add a front porch. health note: existing 4br septic system. revision approved 10/13/2020: m | Falmouth Town | — |
| Sep 26, 2019 | RESI. | move basement stairs. | Falmouth Town | — |
| Oct 29, 2018 | RESI. | add second story to existing, add exterior stairway, extend roof to cover stairs boh of for 3 bedrooms using existing system. con: project approved by concom wa | Falmouth Town | — |
| May 2, 2018 | RESI. | build a 20x44 2 story addition onto to existing house with front and back porches and to include living and dining room on first floor and 2 bedrooms and 1 full | Falmouth Town | — |
| Oct 25, 2017 | SFA | ul number: 1482 737 type: radiant wood chimney: metal insulated | Falmouth Town | — |
| Sep 21, 2016 | RESI. | residential new-demolish new home and garage and build new home. health: attic space not for use as habitable space. sheerwall detail to be provided prior to sh | Falmouth Town | — |
| Sep 14, 2016 | RESI. | residential new- plywood panels for wind borne debris region. bath fans for ventilation. stamped plan required for first floor deck before final inspection | Falmouth Town | — |
| Dec 24, 2015 | RESI. | change a window to a door. no change to frame. add porch steps to grade. ***zba #124-15*** ***plywood panels for wbd region*** | Falmouth Town | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.