Contractor · Electrical

MEDANA ELECTRICAL SERVICE CORP.

23 building permits since 2023 in Fontana city, CA; Monterey Park city, CA and Murrieta city, CA, across 4 counties — $5,200 in reported job value over 2 permits that state one.

Building permits
23
Reported job value
$5.2K
Active
2023–2026
Latest permit
Mar 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Fontana city, CA4
  • Monterey Park city, CA4
  • Murrieta city, CA2
  • Rancho Cucamonga city, CA2
  • Whittier city, CA2
  • Anaheim city, CA1
  • Brea city, CA1
  • Carson city, CA1
  • Chino city, CA1
  • Huntington Beach city, CA1

Permits by year

By issue date (application date where there is none).

012.525
22
20232026*
* 2026 is year to date.
View as table
YearPermits
20231
2026 (YTD)22

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical23
  • EV chargers21
  • Electric meters3
  • Windows & doors1

Permit types

As the building departments classify them.

  • Electrical21
  • BLD- Electrical Installation1
  • BLD- Electrical Meter Change Out (MPU)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 29, 2026Electrical200amp / 200 busbar panel upgrade with surge protection. Edison spot required before inspection can be performed. Panel upgrade requires that all bonding be comWhittier City—
Mar 26, 2026ElectricalUpgrade meter panel to 200a and install ev outlet on side of house near front doorSan Dimas City—
Mar 23, 2026ElectricalMain panel upgrade & ev charger outlet - sce releaseMoreno Valley City—
Mar 15, 2026ElectricalElectric panel upgrade to 200amp and add a 240 40a circuit and one nema 14-50r outlet (ready for 7.68kw ev charger)Monterey Park City—
Mar 15, 2026ElectricalElectric panel upgrade to 200amp and add a 240 40a circuit and one nema 14-50r outlet (ready for 7.68kw ev charger)Monterey Park City—
Mar 9, 2026ElectricalElectrical: 200 amp meter ev charger: install (1) new ev in garageAnaheim City—
Mar 5, 2026ElectricalElectric panel upgrade to 200amp and instal tesla wall connector chargerBrea City—
Mar 5, 2026Electrical200amp main panel upgrade and add a 240 40a circuit. Also installing a nema 14-50r ev outlet.Monterey Park City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled20
  • Active2
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.