Contractor · Electrical
Freedom Forever
23 building permits since 2021 in Mesa city, AZ — $530,942 in reported job value over 23 permits that state one.
- Building permits
- 23
- Reported job value
- $530.9K
- Active
- 2021–2023
- Latest permit
- May 25, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ23
Permits by year
By issue date (application date where there is none).
07.515
11
202120222023
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 2 |
| 2022 | 11 |
| 2023 | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical23
- Solar21
- Battery storage8
- Electric meters8
Permit types
As the building departments classify them.
- Electrical23
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 25, 2023 | Electrical | THIS PERMIT IS TO UPGRADE TO A 225A SERVICE PANEL WITH A 200A MAIN BREAKER. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. DO NOT DISCONNECT UTIL | Mesa | $3,000 |
| May 16, 2023 | Electrical | Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO | Mesa | $3,000 |
| May 15, 2023 | Electrical | THIS PERMIT IS TO UPGRADE TO A 200A PANEL. INSPECTOR TO FIELD VERIFY ELECTRICAL WORK FOR PANEL UPGRADE. ALL ELECTRICAL WORK TO COMPLY WITH SRP AND 2018 IRC. DO | Mesa | $3,000 |
| Feb 21, 2023 | Electrical | THIS PERMIT IS ONLY FOR THE INSTALLATION OF ONE (1) SOLAREDGE ENERGY STORAGE SYTEMS AND BACKUP SYSTEM. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATI | Mesa | $22,716 |
| Feb 7, 2023 | Electrical | Main Panel Upgrade 6.32 KW DC System-Roof Mount PV with Production Meter and AC Disco | Mesa | $27,896 |
| Jan 30, 2023 | Electrical | Brooke Gossling Revisions to PMT22-19693 - THIS PERMIT IS ONLY FOR THE INSTALLATION OF ONE (1) TESLA POWER WALL + AND BACKUP GATEWAY. ALL WORK TO BE PERFORMED P | Mesa | $14,000 |
| Jan 10, 2023 | Electrical | NEW 225 ELECTRIC SERVICE PANEL UPGRADE ONLY. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. PERMIT DOES NOT INCLUDE PV SOLAR SYSTEM INSTALLATION. | Mesa | $48,900 |
| Jan 6, 2023 | Electrical | THIS PERMIT IS ONLY FOR THE INSTALLATION OF ONE (1) TESLA POWER WALL ENERGY STORAGE SYTEMS AND BACKUP GATEWAY SYSTEM. ALL WORK TO BE PERFORMED PER IRC 2018 AND | Mesa | $33,516 |
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.