Contractor · Demolition & excavation

County of Santa Cruz

23 building permits since 2013 in Santa Cruz County, CA.

Building permits
23
Reported job value
—
Active
2013–2024
Latest permit
Apr 25, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA23

Permits by year

By issue date (application date where there is none).

0510
10
2018202020222024
View as table
YearPermits
20131
20187
201910
20201
20211
20221
20231
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Grading & excavation6
  • Bathrooms6
  • Demolition3
  • Solar2
  • Electrical2
  • Accessory dwelling units1
  • HVAC1
  • Telecom1
  • Windows & doors1
  • Electric meters1

Permit types

As the building departments classify them.

  • Building23

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 25, 2024BuildingExtension to permit B-183539 to extend until 10/24/2024Santa Cruz County—
Oct 25, 2023BuildingDemolition of 2 existing residential structures, one at 111 Ralston Ridge and one at 113 Ralston Ridge. Special inspection done under B-195320, which is completSanta Cruz County—
Sep 30, 2022BuildingFelton FPD/SRA Mod Install 800A automatic transfer switch next to main switch gear which will run entire building during power outages. Batch ran @ 4/19/2023 8:Santa Cruz County—
Jan 7, 2021Building12/3/20 - resubmitted as ePlan MODIFICATION to existing PV system to include new switch and metering system including new 1200amp MPU. New underground conduits Santa Cruz County—
Feb 3, 2020BuildingConstruction Change Document #1 to permit B-191368, to include a pre-engineered prefabricated pedestrian bridgeSanta Cruz County—
Dec 17, 2019BuildingNV23878 Special Inspection to determine if existing SFD (111 Ralston Ridge).& Second Dwelling Unit (113 Ralston Ridge) meet code requirements to be moved. Demo Santa Cruz County—
Oct 8, 2019BuildingConstruct (1) monument sign, (1) wall sign and (4) parking lot signs for the Felton Library.Santa Cruz County—
Sep 18, 2019BuildingVerizon small cell installation on a PG&E wood utility pole, scope to include, Installation of (1) cantenna, (2) RRU's w/PSUs, (1) fiber demark box, (1) AC distSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed17
  • Active4
  • Not stated2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

County of Santa Cruz — Building Permits & Contractor Profile | Buildstats