Contractor · Electrical

CLEAN-POWER 2N

23 building permits since 2026 in Eastvale city, CA; Ontario city, CA and Monterey Park city, CA, across 5 counties — $20,000 in reported job value over 1 permits that state one.

Building permits
23
Reported job value
$20K
Active
2026
Latest permit
Mar 31, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Eastvale city, CA7
  • Ontario city, CA5
  • Monterey Park city, CA3
  • Rancho Cucamonga city, CA3
  • Alameda County, CA1
  • Chino city, CA1
  • Fontana city, CA1
  • Fremont city, CA1
  • Yorba Linda city, CA1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical23
  • Solar20
  • Battery storage8
  • Roofing1

Permit types

As the building departments classify them.

  • Electrical22
  • Building Electrical1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 31, 2026ElectricalInstall 14 pv modules (5.67kw) with solax power network technology (zhe jiang) co., ltd. Inverter; install 1 ess unit, location = exterior side of exterior wallOntario City—
Mar 27, 2026ElectricalInstall 13 pv modules (5.265kw) with solax power network technology (zhe jiang) co., ltd. Inverter; install 1 ess unit, location = exterior side of exterior walOntario City—
Mar 27, 2026ElectricalSolarapp+ - new roof mounted pv solar panel modules 5.27kw; (15) energy storage system(s)Chino City—
Mar 23, 2026Building ElectricalSolar Photovoltaic Resi INSTALL ROOF - MOUNTED SOLAR PV SYSTEM: 5.265 KW, 13 MODULES INSTALL 1 ENERGY STORAGE SYSTEM BATTERIES, 15.00 KWH PER BATTERY. INSTALL 1Alameda County$20,000
Mar 19, 2026ElectricalSolarappRancho Cucamonga City—
Mar 17, 2026ElectricalRoof mounted pv + ess, (13) modules, system size 5.27 kw dc, (1) inverter/ess (15kwh)Monterey Park City—
Mar 13, 2026ElectricalRoof mounted pv + ess, (13) modules, system size 5.265 kw dc, (1) inverter/ess (15kwh)Eastvale City—
Mar 10, 2026ElectricalInstall 13 pv modules (5.27kw) with solax power network technology (zhe jiang) co., ltd. Inverter; install 1 ess unit, location = exterior side of exterior wallOntario City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled17
  • Active5
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.