Contractor · Electrical

CASTRO EXPRESS CONSTRUCTION INC

23 building permits since 2024 in Sacramento city, CA and Sacramento County, CA — $43,662 in reported job value over 23 permits that state one.

Building permits
23
Reported job value
$43.7K
Active
2024–2026
Latest permit
Jun 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento city, CA22
  • Sacramento County, CA1

Permits by year

By issue date (application date where there is none).

07.515
11
202420252026*
* 2026 is year to date.
View as table
YearPermits
20241
202511
2026 (YTD)11

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical23
  • EV chargers8
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Single Family22
  • MISR1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 8, 2026Single FamilyEPC - EV Charger Permit: Adding a 40A circuit to existing panel for electric vehicle charging station. Water conserving fixtures are required to be installed thSacramento$800
Jun 7, 2026Single FamilyE-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work, main breaker replacement.Sacramento$3,000
May 5, 2026Single FamilyE-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement.Sacramento$2,461
Apr 28, 2026Single FamilyE-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, Reuse Existing weather head/masthead work, main breaker replacement.Sacramento$2,111
Apr 10, 2026Single FamilyEPC - Adding 40A 240v branch circuit from the main 200A panel using the existing EV Raceway. Water conserving fixtures are required to be installed throughout tSacramento$1,200
Feb 23, 2026Single FamilyEPC - Adding an EV Charging Station to the residence. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: ResidenSacramento$700
Feb 20, 2026Single FamilyE-Permit: existing panel 125 Amps - Underground service, new main panel 150 Amps, N/A weather head/masthead work, main breaker replacement.Sacramento$3,400
Feb 10, 2026Single FamilyE-Permit: existing panel 100 Amps - Overhead service, new main panel 125 Amps, Reuse Existing weather head/masthead work, main breaker replacement.Sacramento$3,500

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.