Contractor · Electrical
CASTRO EXPRESS CONSTRUCTION INC
23 building permits since 2024 in Sacramento city, CA and Sacramento County, CA — $43,662 in reported job value over 23 permits that state one.
- Building permits
- 23
- Reported job value
- $43.7K
- Active
- 2024–2026
- Latest permit
- Jun 8, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA22
- Sacramento County, CA1
Permits by year
By issue date (application date where there is none).
07.515
11
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2025 | 11 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical23
- EV chargers8
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Single Family22
- MISR1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 8, 2026 | Single Family | EPC - EV Charger Permit: Adding a 40A circuit to existing panel for electric vehicle charging station. Water conserving fixtures are required to be installed th | Sacramento | $800 |
| Jun 7, 2026 | Single Family | E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work, main breaker replacement. | Sacramento | $3,000 |
| May 5, 2026 | Single Family | E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement. | Sacramento | $2,461 |
| Apr 28, 2026 | Single Family | E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, Reuse Existing weather head/masthead work, main breaker replacement. | Sacramento | $2,111 |
| Apr 10, 2026 | Single Family | EPC - Adding 40A 240v branch circuit from the main 200A panel using the existing EV Raceway. Water conserving fixtures are required to be installed throughout t | Sacramento | $1,200 |
| Feb 23, 2026 | Single Family | EPC - Adding an EV Charging Station to the residence. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residen | Sacramento | $700 |
| Feb 20, 2026 | Single Family | E-Permit: existing panel 125 Amps - Underground service, new main panel 150 Amps, N/A weather head/masthead work, main breaker replacement. | Sacramento | $3,400 |
| Feb 10, 2026 | Single Family | E-Permit: existing panel 100 Amps - Overhead service, new main panel 125 Amps, Reuse Existing weather head/masthead work, main breaker replacement. | Sacramento | $3,500 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.