Contractor · General building

CAMPHILL COMMUNITIES CALIFORNIA

23 building permits since 1999 in Santa Cruz County, CA.

Building permits
23
Reported job value
—
Active
1999–2026
Latest permit
Jul 2, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA23

Permits by year

By issue date (application date where there is none).

048
7
200220042011202020222026*
* 2026 is year to date.
View as table
YearPermits
19991
20021
20031
20043
20051
20111
20131
20203
20212
20221
20251
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical7
  • Solar6
  • Bathrooms6
  • Remodels5
  • Accessory dwelling units4
  • Fire sprinklers3
  • HVAC2
  • Battery storage2
  • Roofing2
  • Additions2

Permit types

As the building departments classify them.

  • Building23

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 2, 2026BuildingPA231035 and PA231036 SB9 application (no lot split). Construction of a (N) 4,183 SF 3-bedroom / 2-bathroom SFD with a 24 SF covered porch and 236 SF trellis. PSanta Cruz County—
Jul 2, 2026BuildingThis application was created as a result of Master Application APP-261027. PA231035and PA231036 SB9 application (no lot split). Construction of a (N) 4,183 SF 3Santa Cruz County—
Jul 2, 2026BuildingThis application was created as a result of Master Application APP-261027. PA231035and PA231036 SB9 application (no lot split). Conversion of 736 SF garage to aSanta Cruz County—
Jun 17, 2026BuildingLocation: 4096 Fairway Drive Soquel, CA 95073 Electrical permit includes new wiring/lights/switches, for renovations at an existing structure, less than 5 circuSanta Cruz County—
Apr 22, 2026BuildingRemoval and re-installation of existing PV system permitted under approved permit B-202586. Only part of the system will be removed and reinstalled - 24 modulesSanta Cruz County—
Apr 8, 2026Building**OWNER TO ADDRESS VOIDED PERMIT 00082224-00082224, 00009184-00082224, 00079686-00079686, B-225022. NO FINAL INSPECTION WILL BE DONE ON THIS PERMIT UNTIL THE VOSanta Cruz County—
Jan 8, 2026BuildingCENTRAL/SRA Remove and replace roughly 1000 SF of existing retaining wall and driveway including improvements to drainage system at an existing SFD. Verify and/Santa Cruz County—
Aug 6, 2025BuildingInstall (1) electric vehicle charging system (EVCS) level 2, (7.7)KW / 240VAC for an existing SFD. Verify and/or install listed smoke and carbon monoxide alarmsSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed17
  • Active3
  • Pending2
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.