Contractor · General building

WILLIAM GOODRICH

24 building permits since 2016 in Buffalo city, NY — $183,824,241 in reported job value over 24 permits that state one.

Building permits
24
Reported job value
$183.8M
Active
2016–2026
Latest permit
Aug 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Buffalo city, NY24

Permits by year

By issue date (application date where there is none).

036
6
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20161
20202
20214
20223
20232
20241
20255
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels10
  • Demolition5
  • Windows & doors4
  • HVAC3
  • Plumbing3
  • Electrical3
  • Roofing2
  • Solar1
  • Additions1
  • Fire sprinklers1

Permit types

As the building departments classify them.

  • GC18
  • TEAROUT3
  • INTBLDOUT2
  • REPAIR1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 20, 2026TEAROUTInterior tearout of roughly half of the 6th floor of the Conventus building. In preparation for interior fit out of office and associated spaces.Buffalo City$444,240
Aug 10, 2026GCYMCA Buffalo Niagara is proposing to construct a day camp at 1984 Elmwood Ave, Buffalo, NY 14207 to consist of an outdoor pool, pool building, activity barns, aBuffalo City$7,500,000
Jul 14, 2026GC( " The Malt House " - Stabilization  ) Project to include full replacement of roof deck and membrane, additional support steel and exterior masonry restorBuffalo City$1,500,000
Apr 16, 2026GCRehabilitation of a 39,418SF existing historic high bay industrial/manufacturing building into a reenergized warm white box for future tenant. The SHPO and NPS Buffalo City$15,000,000
Jan 27, 2026GCInterior level 1 & 2 alterations of the 1st, 4th, and 5th floor of 125 Washington St. Work includes MEP modifications as needed to suit the intended use. BuBuffalo City$10,000,000
Jan 9, 2026INTBLDOUTMetal Stud Framing in the existing office Building on floors 1, 4 and 5. Phase 1 only as per Deputy Mayor Thomas Baines Parent permit GC25-9671009Buffalo City$250,000
Nov 20, 2025TEAROUTGolisano Institute - Selective tear out only in preparation for future work to be done on a separate permit project to include interior walls, doors, finishes, Buffalo City$1,000,000
Oct 10, 2025GCRemove existing stair and reconstruct, remove existing door and seal, replace existing windows and rear entrance from overhead door to storefront.<div><br></divBuffalo City$100,000

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.