Contractor · Demolition & excavation

QWEST CORPORATION DBA CENTURYLINK QC

24 building permits since 2016 in Tacoma city, WA — $12,000 in reported job value over 2 permits that state one.

Building permits
24
Reported job value
$12K
Active
2016–2025
Latest permit
Apr 11, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Tacoma city, WA24

Permits by year

By issue date (application date where there is none).

02.55
5
2017202020222025
View as table
YearPermits
20163
20172
20183
20203
20215
20223
20233
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC1
  • Grading & excavation1
  • Plumbing1

Permit types

As the building departments classify them.

  • Site22
  • Utility Connection2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 11, 2025SiteRequest to access MH 75, MH 364, MH 365, MH 367, MH 465, MH 492, 495, 467, 468, 536, 2 new HH to splice new fiber into existing conduit. Bore +|/- 1376, 2 4x4 bTacoma City—
Feb 10, 2025SiteRequest to access MH 387, MH 471 to place and splice new fiber into exiting conduit. Bore +/- 23' from MH to 4x4 BP 1, then bore +/- 625' to 4x4 BP2, then bore Tacoma City—
May 12, 2023SiteThe project proposes to relocate Lumen facilities along E 64th Street beginning near 6323 E McKinley Ave and running to E. Portland Ave, it will transfer existiTacoma City—
May 12, 2023SiteRequest for aerial placement on 27 poles, place 4 new HH, bore +/- 1517, Trench 10’ @ HH 2. Soft surface disturbance. No hard surface disturbanceTacoma City—
Mar 16, 2023SiteCANCELLEDRequest to access MH 153, HH 3801-19, HH 1952A, HH 3618-23, HH 242OU, HH-AC18 to splice new fiber into existing conduit. Bore +- 670 from HH 242OU to nTacoma City—
Dec 14, 2022SiteCTL FIBER OVERLAY This work order covers the North East area of Tacoma. Various locations will access vaults for splicing and placing fiber. Aerial overbuild atTacoma City—
Jun 23, 2022SiteRequest to access MH 180 and HH 740 to place and splice new fiber into existing conduit. Place 5x5 BP 1 and bore +- 100 from HH 740 to new 264TA HH. Place 5x 5 Tacoma City—
Jan 19, 2022SiteRequest to include install DG&A to pole A0622390. place 1 pole TP1109, Remove pole TP802. Trench +- 36 and R&R 1 28 sq ft sidewalk panel. Overset new 264TA vaulTacoma City—

Permit status

Where its permits stand, as the departments report them.

  • Closed20
  • Finaled2
  • Issued1
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.