Contractor · Electrical
NORTH BAY SOLAR ELECTRIC
24 building permits since 2014 in Marin County, CA and Sonoma County, CA, across 2 counties — $401,697 in reported job value over 20 permits that state one.
- Building permits
- 24
- Reported job value
- $401.7K
- Active
- 2014–2026
- Latest permit
- Mar 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marin County, CA20
- Sonoma County, CA4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 1 |
| 2015 | 2 |
| 2016 | 1 |
| 2017 | 3 |
| 2019 | 1 |
| 2021 | 4 |
| 2023 | 2 |
| 2024 | 2 |
| 2025 | 4 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar14
- Electrical10
- Battery storage8
- Generators2
- Roofing1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- RESIDENTIAL19
- Electrical4
- COMMERCIAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 24, 2026 | Electrical | Revision shows christy box with all existing underground wiring and accurate busbar rating of msp. | Sonoma County | — |
| Mar 12, 2026 | Electrical | Battery was originally located under the house and inspector wants it relocated outside. The only revision on this cycle is that the battery is outside as reque | Sonoma County | — |
| Mar 3, 2026 | Electrical | Evt17-01084 sfd, roof mount solar panel, pv 9.81kw, install on pool house | Sonoma County | — |
| Feb 18, 2026 | Electrical | Added existing generator and ats. Battery in basement/crawlspace. | Sonoma County | — |
| Nov 6, 2025 | RESIDENTIAL | 6.84KW fixed solar roof mount. W/O blackout protection. | Marin County | $36,000 |
| Oct 7, 2025 | RESIDENTIAL | 6.2KW roof mounted solar electric system with 16KW battery backup. | Marin County | $30,000 |
| Sep 15, 2025 | RESIDENTIAL | 5.6KW roof mounted solar electric system with 16KW battery backup | Marin County | $26,200 |
| Feb 5, 2025 | RESIDENTIAL | Electric service change. 100A main breaker Zinsco to 200A panel. | Marin County | $2,000 |
Permit status
Where its permits stand, as the departments report them.
- Not stated20
- Finaled4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.