Contractor · General building
K&T PLUMBING, LLC
24 building permits since 2021 in Howard County, MD.
- Building permits
- 24
- Reported job value
- —
- Active
- 2021–2026
- Latest permit
- May 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD24
Permits by year
By issue date (application date where there is none).
0510
9
20212022202320252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 9 |
| 2022 | 8 |
| 2023 | 3 |
| 2025 | 1 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing24
- Bathrooms19
- Gas15
- Kitchens14
- Water heaters13
- Remodels12
- Additions12
- New construction12
- HVAC10
- Fire sprinklers5
Permit types
As the building departments classify them.
- Residential New Plumbing Permit12
- Residential Plumbing Addition Alteration Permit12
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 18, 2026 | Residential Plumbing Addition Alteration Permit | SFD/install plumbing for 2 full bathrooms, 1 half bathroom and 1 washer standpipe and 1 wet bar sink in newly built addition on right side of existing home. fir | Howard County | — |
| Apr 13, 2026 | Residential New Plumbing Permit | SFD/Installing new plumbing system in new residential home. First floor installing 1-laundry sink, 1-washer standpipe, 1-Lav sink, 1-Water closet, 1-Kitche | Howard County | — |
| Feb 13, 2026 | Residential Plumbing Addition Alteration Permit | SFD/Relocating 1 1/4 natural gas main pipe from back right corner to right front corner of house BGE W.O. #20655717-9936 | Howard County | — |
| Apr 10, 2025 | Residential Plumbing Addition Alteration Permit | SFD/Remodel first floor owners Suite bathroom to include 1-walk-in shower, install 1-ADA toilet, Relocate single lav sink, all to meet ADA standards | Howard County | — |
| Apr 17, 2023 | Residential Plumbing Addition Alteration Permit | Residential alteration- Extending the existing gas stub outs at the exterior/back main level of the house to the permanent locations on the deck and patio/**6.1 | Howard County | — |
| Feb 9, 2023 | Residential Plumbing Addition Alteration Permit | Install new plumbing and gas piping in addition. First floor- 2 toilets, 3 lav sinks, 1 laundry sink, 1 mop sink, 1 washer/standpipe, 1 vegetable prep sink, 1 s | Howard County | — |
| Jan 18, 2023 | Residential New Plumbing Permit | Install new plumbing and plumbing fixtures in new single family home: basement-1 toilet, 1 tub/shower, 1 lav sink, 2 hose bibs, 1 ejector pit, 1 sump pump, 1 co | Howard County | — |
| Nov 30, 2022 | Residential New Plumbing Permit | SFD/Install and connect new plumbing in new single family home/ Basement location: 1 bar sink, 1 dishwasher, 1 toilet, 1 tub/shower, 1 lav sink, 2 hose bibs, 1 | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed21
- Issued3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.