Contractor · Electrical

kahlil peckham

24 building permits since 2023 in Falmouth town, MA; Barnstable Town city, MA and Brewster town, MA, across 2 counties — $272,320 in reported job value over 15 permits that state one.

Building permits
24
Reported job value
$272.3K
Active
2023–2026
Latest permit
Jun 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA9
  • Barnstable Town city, MA7
  • Brewster town, MA3
  • Bourne town, MA2
  • Wareham town, MA2
  • Yarmouth town, MA1

Permits by year

By issue date (application date where there is none).

07.515
11
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20231
20248
202511
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar18
  • Electrical10
  • Battery storage7
  • Electric meters4
  • New construction2
  • Remodels1
  • Roofing1

Permit types

As the building departments classify them.

  • RESI.6
  • Building Permit - Residential4
  • Electrical Permit4
  • Building Permit3
  • ELECT.2
  • Wiring Permit2
  • Building Permit - Express1
  • COMM.1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 11, 2026Building PermitInstallation of a 10.62kW (DC) rooftop-mounted solar photovoltaic system comprised of 18 590 Watt solar modules. Panels will be flush-mounted to the existing meBourne Town$27,360
May 7, 2026Building Permit - ResidentialInstallation of 7.08kW (10kWh) energy storage battery mounted on the exterior of the home. Battery is a single unit, mounted on the north side exterior. The batBarnstable Town City$7,000
Apr 14, 2026Expedited Building Permit - CommercialAdding fiberglass insulation to atticBarnstable Town City$2,500
Apr 7, 2026Electrical PermitSolar PanelsBourne Town$27,360
Dec 31, 2025Building Permit - ResidentialInstallation of a 62 module, 21.065kW (DC), rooftop solar photovoltaic system. Panels will be mounted on flush-mount racking, which will be attached to framing Barnstable Town City$18,000
Dec 15, 2025RESI.installation of a 6.16w rooftop solar photovoltaic system comprised of sixteen 385w solar panels.Falmouth Town—
Nov 26, 2025RESI.installation of a 11.88kw rooftop solar photovoltaic system on four separate roofs. panels installed on flush-mount racking attached to framing members. system Falmouth Town—
Nov 21, 2025Wiring PermitESSBrewster Town$5,900

Permit status

Where its permits stand, as the departments report them.

  • Closed9
  • Active8
  • Completed7

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.