Contractor · General building

FRANCIS PADILLA

24 building permits since 1991 in Santa Cruz County, CA and Santa Cruz city, CA.

Building permits
24
Reported job value
—
Active
1991–2022
Latest permit
May 2, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA23
  • Santa Cruz city, CA1

Permits by year

By issue date (application date where there is none).

048
7
19921994200420122022
View as table
YearPermits
19911
19927
19931
19943
19956
20041
20081
20122
20131
20221

Type of work

Permits describing each kind of work; one permit can cover several.

  • Additions7
  • Bathrooms6
  • Roofing4
  • Electrical4
  • Pools & hot tubs4
  • Remodels3
  • Electric meters3
  • Accessory dwelling units2
  • Windows & doors2
  • Kitchens1

Permit types

As the building departments classify them.

  • Building23
  • Plumbing1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 2, 2022BuildingCZU REBUILD SFD 2 BED 2 BA (2509) UNC STORAGE (1034) UNC WEIGHT ROOM (389) ATTACHED JUNIOR ADU 1 BED / 1 BA (496) UPDATE: EXTEND PERMIT TO 7/10/2024 Batch ran @Santa Cruz County—
Nov 7, 2013PlumbingSpecial inspection to leagalize laundry hook up and replaceSanta Cruz City—
Jul 16, 2012BuildingReplace/upgrade main electrical; service panel, tear-off existing roofing and install stading-seam metal roofing class B or better at an existing attached garagSanta Cruz County—
Jan 9, 2012BuildingOverlay existing roofing with comp. shingles class B or better at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combination smokSanta Cruz County—
Mar 3, 2008Building"AS-BUILT" Install circular stairway to an existing storage area and replace window with door at an existing SFD.Santa Cruz County—
Oct 14, 2004BuildingE/P/M: Repair-in-Kind permit to refurbish an existing SFD not to exceed 10% of the structure. Inspector may require plans.Santa Cruz County—
Sep 21, 1995BuildingConstruct 1 story SFD with 3 bedrooms, 3.5 baths, porch and attached garage. CHANGE ORDER #1 ISSUED 07/29/98Santa Cruz County—
Sep 21, 1995BuildingConstruct 1 story detached shop, to include a 200AMP electric meter. CHANGE ORDER #1 ISSUED 04/06/01Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed22
  • Expired1
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.