Contractor · General building

Enrique Mcdonald

24 building permits since 2012 in Orleans Parish, LA.

Building permits
24
Reported job value
—
Active
2012–2021
Latest permit
Jan 28, 2021

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA24

Permits by year

By issue date (application date where there is none).

024
4
2013201620182021
View as table
YearPermits
20122
20134
20143
20164
20173
20183
20194
20211

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels17
  • Electrical13
  • Plumbing10
  • HVAC8
  • Demolition4
  • Windows & doors4
  • Roofing3
  • Kitchens2
  • Bathrooms2
  • Additions1

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)5
  • Renovation (Structural)3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 28, 2021Renovation (Structural)Demo and renovation. Renovation includes electrical, plumbing, HVAC, painting, carpentry, drywall, and siding.Orleans Parish—
Jun 26, 2019Renovation (Non-Structural)Nonstructural work to be done - scope of work includes drywall, cabinets, flooring, stairs, paintingOrleans Parish—
Apr 26, 2019Renovation (Non-Structural)Interior paint, trim, doors, ceiling tiles, and electrical. NO HVAC, plumbing, or demo of any walls. Shell only. no use and occupancy.Orleans Parish—
Mar 13, 2019Renovation (Non-Structural)Non structural renovation to a two family dwelling. Scope of work to include drywall, painting, plumbing, and electrical.Orleans Parish—
Jan 16, 2019Renovation (Non-Structural)Replacing kitchen cabinets, replacing bath tubs, patching drywall, removing and replacing shingles, paint, patch driveway. NO ELECTRICAL OR PLUMBINGOrleans Parish—
Nov 20, 2018Renovation (Non-Structural)Renovate main floor of single - carpentry, drywall, painting, plumbing, electrical, no exterior work, no demo of any walls, bottom floor to remain as basement (Orleans Parish—
Nov 20, 2018Renovation (Structural)Convert single to double per plans.Orleans Parish—
Feb 22, 2018Renovation (Structural)Renovate 7-story 122 room existing hotel as per plans. Temp. c/o good for 30 days, Till; 03-15-2019Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • C/o issued17
  • Closed4
  • Issued2
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.