Contractor · Electrical
Bruce Crisp
24 building permits since 2013 in Boston city, MA; Cranston city, RI and Tiverton town, RI, across 8 counties — $14,773,866 in reported job value over 22 permits that state one.
- Building permits
- 24
- Reported job value
- $14.8M
- Active
- 2013–2026
- Latest permit
- Jul 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boston city, MA9
- Cranston city, RI4
- Tiverton town, RI2
- Woonsocket city, RI2
- Lee town, MA1
- Everett city, MA1
- Marshfield town, MA1
- East Greenwich town, RI1
- West Warwick town, RI1
- Smithfield town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 2 |
| 2022 | 1 |
| 2023 | 7 |
| 2024 | 4 |
| 2025 | 8 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical19
- HVAC2
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical Permit8
- ELECTRICAL5
- 2) Electrical Permit4
- FA2
- LVOLT2
- Building Permit1
- EG Electrical Permit1
- ELECT1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 14, 2026 | Electrical Permit | Installation of BDA system | Woonsocket City | $77,000 |
| Apr 27, 2026 | Electrical Permit | Installation of low voltage access control (Bldg & Autogate access control), cctv, music speakers | Woonsocket City | $154,197 |
| Nov 11, 2025 | Electrical Permit | CCTV-INSTALLED THROUGH OUT FACILITY-DATA-PHONE DROPS & OFFICE ALARM INSTALLED IN THE OFFICE | Marshfield Town | $23,000 |
| Oct 16, 2025 | EG Electrical Permit | Disconnect old cat scan machine and replace with new. Replace old lights in ct room and control room. Replace lighting in changing rooms. Old work two wall scon | East Greenwich Town | $18,000 |
| Oct 14, 2025 | 2) Electrical Permit | CCTV, ACCESS CONTROL, DATA DROPS | Cranston City | $75,000 |
| Jun 26, 2025 | ELECTRICAL | ELECTRICAL | Boston City | $5,000 |
| Jun 19, 2025 | 2) Electrical Permit | Disconnect existing MRI machine. Install 2 new panels and transformer for new MRI machine. Wiring for new chiller units install and wire new MRI lighting | Cranston City | $35,000 |
| Jun 9, 2025 | Electrical Permit | Instalaltion of radio enhancement system | West Warwick Town | $85,397 |
Permit status
Where its permits stand, as the departments report them.
- Completed12
- Active10
- Closed1
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.