Contractor · Electrical

Black

24 building permits since 2022 in Los Angeles city, CA.

Building permits
24
Reported job value
—
Active
2022
Latest permit
Aug 5, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA24

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical24
  • Solar14
  • Battery storage4
  • Roofing4

Permit types

As the building departments classify them.

  • Electrical24

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 5, 2022ElectricalPV1. Install Roof Mounted PV, 12.75 KWdc / 7.60KWac ((30) modules ILos Angeles City—
Aug 2, 2022Electrical(EPlan) PV1 PC for installation of roof mounted solar glass tiles. PVLos Angeles City—
Jun 23, 2022Electrical(E-PLAN) NEW PV1 ROOF-MOUNTED INSTALLATION. SCOPE OF WORK INCLUDES 16Los Angeles City—
May 17, 2022Electrical[EPLAN] PLAN CHECK FOR CHANGES TO AN APPROVED SET, CHANGES INCLUDE INVLos Angeles City—
Apr 28, 2022Electrical[ePlan][PV1] Installation of a new 15.2kWAC PV system with 202 solar rLos Angeles City—
Apr 28, 2022Electrical[ePlan][PV1] Installation of a new 7.6kWAC PV system with 165 modules,Los Angeles City—
Apr 28, 2022ElectricalEPLAN. PV1 SYSTEM. SCOPE OF WORK INCLUDES: (201) TESLA SOLAR ROOF MODULos Angeles City—
Apr 1, 2022ElectricalEplan: Plan check for a 11.5kw DC/ 7.6kW AC roofmouted pv system withLos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.