Contractor · Specialty (solar, fire, telecom)

ALL ON ELECTRIC

24 building permits since 2013 in Contra Costa County, CA; Marin County, CA and San Jose city, CA, across 7 counties — $426,897 in reported job value over 16 permits that state one.

Building permits
24
Reported job value
$426.9K
Active
2013–2026
Latest permit
Oct 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Contra Costa County, CA5
  • Marin County, CA5
  • San Jose city, CA5
  • Alameda County, CA1
  • San Mateo County, CA1
  • Davis city, CA1
  • Elk Grove city, CA1
  • Los Altos Hills town, CA1
  • Martinez city, CA1
  • Mountain View city, CA1

Permits by year

By issue date (application date where there is none).

048
8
201320162018202120232026*
* 2026 is year to date.
View as table
YearPermits
20131
20141
20161
20173
20183
20191
20212
20222
20231
20251
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar14
  • Electrical6
  • Battery storage4
  • Remodels3
  • Additions3
  • Roofing2
  • Plumbing1
  • Water heaters1

Permit types

As the building departments classify them.

  • RESIDENTIAL5
  • E3
  • 1 & 2 Family Residential2
  • Condo2
  • Electrical2
  • BL, CH, EL1
  • Building Electrical1
  • ONLINE SOLAR PHOTOVOLTAIC PERMITS1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 12, 2026PVRInstall 7.38kw 18 module roof mountContra Costa County$11,070
Oct 9, 2026ERemove and reinstall solar panels for reroof (no change to array location). THE SOLAR PANELS APPROVED STAMPS PLANS FOR BIPVR19-010360 MUST BE ON SITE @ TIME OF Contra Costa County$5,000
Sep 22, 2026PVCInstall 55.88kw 88 module roof mount photovoltaic system with new 200amp pv combiner subpanel and 200amp non-fused ac disconnect at Shell gas stationContra Costa County$83,000
May 28, 2026EInstall Powerwall 3 and expansion unit. Site has existing solarContra Costa County$10,000
May 18, 2026ERemove existing SunPower inverters and replace them with 4 Powerwall 3s and 1 Powerwall Expansion PackContra Costa County$71,680
Mar 17, 2026ElectricalRemove and re-install only 6 modules of existing pv system (in-kind) due to re-roofMartinez City$1,000
Feb 5, 2026Building ElectricalSolar Photovoltaic Resi INSTALL 3 ENERGY STORAGE SYSTEM BATTERIES, 13.50 KWH PER BATTERY. INSTALL 1 NEW ELECTRICAL PANEL(S), 200AMPSAlameda County$38,000
Jan 14, 2026ElectricalWe will be installing 10 x ja440w modules instead of 12 x silfab370 modules.San Mateo County—

Permit status

Where its permits stand, as the departments report them.

  • Issued7
  • Not stated7
  • Expired5
  • Finaled3
  • Closed1
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.