Contractor · Specialty (solar, fire, telecom)

AICON TECHNOLOGIES DBA AICON SOLAR

24 building permits since 2022 in San Diego County, CA.

Building permits
24
Reported job value
—
Active
2022–2023
Latest permit
Oct 13, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA24

Permits by year

By issue date (application date where there is none).

012.525
23
20222023
View as table
YearPermits
20221
202323

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar24
  • Battery storage4

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 13, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does nSan Diego County—
Sep 1, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does nSan Diego County—
Aug 29, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Aug 29, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Aug 18, 2023—GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURESan Diego County—
Jul 7, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jul 6, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jul 6, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Active15
  • Issued9

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.