Contractor · Electrical

AFFORDABLE SEPTIC

24 building permits since 2002 in Santa Cruz County, CA.

Building permits
24
Reported job value
—
Active
2002–2025
Latest permit
Aug 7, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA24

Permits by year

By issue date (application date where there is none).

036
6
2007200920112025
View as table
YearPermits
20021
20071
20083
20093
20105
20116
20124
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical17

Permit types

As the building departments classify them.

  • Building24

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 7, 2025BuildingExtension #1 granted to permit B-102451 to 02/07/2026.Santa Cruz County—
Sep 25, 2012BuildingEL: Install a new electrical circut branch to power a septic pump system at an exsiting SFD.Santa Cruz County—
Apr 10, 2012BuildingInstall electrical for new pump-up system for an existing septic system that serves an existing SFD.Santa Cruz County—
Apr 2, 2012BuildingInstall electrical for a pump-up septic system that serves an existing SFD.Santa Cruz County—
Jan 23, 2012BuildingInstall new 20amp curcuit for septic pump-up system at an existing SFD.Santa Cruz County—
Sep 28, 2011BuildingElectrical for a septic pump-up system that serves an existing SFD.Santa Cruz County—
Aug 29, 2011BuildingReplace electric pump up system for septic system at an existing SFD.Santa Cruz County—
Jul 6, 2011BuildingReplace/upgrade main electrical service panel at an existing SFD.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed20
  • Active2
  • Not stated2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.