Contractor · Roofing
ADIRONDACK SIDING & ROOFING
24 building permits since 2000 in Buffalo city, NY — $174,049 in reported job value over 24 permits that state one.
- Building permits
- 24
- Reported job value
- $174K
- Active
- 2000–2008
- Latest permit
- Sep 4, 2008
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY24
Permits by year
By issue date (application date where there is none).
0510
10
2000200220042008
View as tableHide table
| Year | Permits |
|---|---|
| 2000 | 1 |
| 2001 | 2 |
| 2002 | 10 |
| 2003 | 3 |
| 2004 | 3 |
| 2006 | 2 |
| 2008 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing18
- Windows & doors3
- Plumbing1
Permit types
As the building departments classify them.
- REPAIR24
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 4, 2008 | REPAIR | Install vinyl siding by Alside using 3/8 fanfold insulation backing. Install vinyl soffits and vinyl-coated aluminum trim on fasia, windows & doors. Siding on h | Buffalo City | $8,500 |
| Sep 4, 2008 | REPAIR | Tear off existing shingles of house only. Install 1/2 inch CDX plywood. Install 6' ice & water guard (GAF) along drip edges. Install #15 lb felt on remaining ex | Buffalo City | $8,250 |
| Jul 16, 2008 | REPAIR | Install Alside vinyl siding over existing surface using 3/8 fanfold insulation backer, vinyl corners, j-channel. Install vinyl soffits. Vent eaves. seamless gut | Buffalo City | $6,495 |
| Aug 25, 2006 | REPAIR | Tear of 3 layers of shingles. Install 1/2 " CDX plywood all upper portions. Install 54" ice shield on all drip edges, 3' in valleys. Install #15 lb. felt over r | Buffalo City | $8,330 |
| Jun 2, 2006 | REPAIR | Tear off asphalt & cedar shingles. Install 1/2" CDX plywood, 6' ice shield along dip edges, along dormer walls, chimney base. Install #15lb. felt over remaining | Buffalo City | $9,640 |
| Aug 25, 2004 | REPAIR | Tear off 3 layers of roof-house and garage. Install half inch p;lywood on pitched areas, three quarter plywood onflat areas. Install ice & water on drip edges, | Buffalo City | $13,940 |
| Jun 25, 2004 | REPAIR | ITear off existing layer of roofing on front prrch deck. Remove railing. Install fibre-glass underlayment with cap nails. Install rubberized mop down roof. Re-i | Buffalo City | $1,930 |
| Jun 25, 2004 | REPAIR | Tear off existing layers of roof. Install 54" ice & water shield, #15lb felt. Install chimney & wall flashing. Install cobra ridge vent. Install aluminum drip & | Buffalo City | $7,190 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.