Contractor · Specialty (solar, fire, telecom)

Village of Greenport

25 building permits since 1965 in Southold town, NY.

Building permits
25
Reported job value
—
Active
1965–2023
Latest permit
Oct 27, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Southold town, NY25

Permits by year

By issue date (application date where there is none).

02.55
5
20102013201620202023
View as table
YearPermits
19651
20101
20111
20121
20131
20145
20151
20162
20183
20191
20201
20211
20224
20232

Type of work

Permits describing each kind of work; one permit can cover several.

  • Telecom17
  • New construction9
  • Generators3
  • Electrical3
  • Additions2
  • Bathrooms2
  • HVAC1
  • Kitchens1
  • Remodels1
  • Windows & doors1

Permit types

As the building departments classify them.

  • VG EXISTING COMMERCIAL14
  • VG NEW COMMERCIAL8
  • HISTORICAL1
  • VG ELECTRICAL1
  • VG RESIDENTIAL NEW CONSTRUCTION1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 27, 2023VG EXISTING COMMERCIALRENOVATION OF EXISTING KITCHEN AND 2 BATHROOMS ON GROUND LEVEL OF BUILDINGSouthold Town—
Jun 22, 2023VG EXISTING COMMERCIALTHIS PERMIT REPLACES PERMIT # 02930. Upgrade and maintenance of existing public utility wireless communication facility.Southold Town—
Sep 6, 2022VG NEW COMMERCIALCONSTRUCTION OF MINITATURE RAILROAD TRAIN STATION / GARAGE. AS PER PLANS PREPARED BY ROBERT BROWN RA DATED 5/6/2022. ALL CONSTRUCTION TO COMPLY WITH FEDERAL, STSouthold Town—
Jul 29, 2022VG EXISTING COMMERCIALUpgrade and maintenance of existing public utility wireless communication facility.Southold Town—
Apr 29, 2022VG ELECTRICALInstallation of DISH Wireless Antennas on existing tower. All construction to comply with federal, state and local rules and regulations.Southold Town—
Apr 11, 2022VG RESIDENTIAL NEW CONSTRUCTIONREBUILD 2 BEDROOM 1 STORY HOUSE AS PER PLANS PREPARED BY JOHN DANIEL ROSEBERY DATED 8/2021. ALL CONSTRUCTION TO COMPLY WITH FEDERAL, STATE AND LOCAL RULES AND RSouthold Town—
Aug 13, 2021VG EXISTING COMMERCIALUpgrade and maintenance of existing public utility wireless communication facility. Drawings prepared by Scott Chasse LPE dated 4/2/21 All work to comply with FSouthold Town—
Sep 10, 2020VG EXISTING COMMERCIALUpgrades to existing facilty to include replacing: - 3 existing panel antennas with 3 proposed panel antennas - 3 existing radios with 3 radios. - Removing 19 1Southold Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed21
  • Issued4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

Village of Greenport — Building Permits & Contractor Profile | Buildstats