Contractor · Electrical
SOLAR TOPPS LLC
25 building permits since 2014 in Mesa city, AZ and Phoenix city, AZ — $2,183,562 in reported job value over 24 permits that state one.
- Building permits
- 25
- Reported job value
- $2.2M
- Active
- 2014–2025
- Latest permit
- Nov 6, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ15
- Phoenix city, AZ10
Permits by year
By issue date (application date where there is none).
048
8
20142016201920222025
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 1 |
| 2015 | 2 |
| 2016 | 2 |
| 2017 | 2 |
| 2019 | 2 |
| 2020 | 3 |
| 2022 | 1 |
| 2024 | 4 |
| 2025 | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- Solar13
- Battery storage11
- Electric meters9
Permit types
As the building departments classify them.
- Electrical13
- SE10
- Other Commercial1
- Res (OTH) -- Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 6, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $47,443 |
| Oct 16, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO ENPHASE IQ BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY | Mesa | $52,595 |
| Oct 7, 2025 | Electrical | PERMIT IS ONLY FOR UPGRADE TO A 200A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL W | Mesa | $40,915 |
| Sep 29, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UT | Mesa | $56,415 |
| Sep 23, 2025 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE ENPHASE IQ BATTERY 10C. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED P | Mesa | $39,625 |
| Sep 23, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE ENPHASE BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVI | Mesa | $37,340 |
| Aug 21, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UT | Mesa | $45,315 |
| Jan 29, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND A 200 AMP PANEL UPGRADE. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION I | Mesa | $39,000 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued14
- Completed6
- Expired4
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.