Contractor · HVAC
SCOT ROGERS
25 building permits since 2020 in Glastonbury town, CT; Stonington town, CT and Bristol town, CT, across 4 counties — $1,158,200 in reported job value over 24 permits that state one.
- Building permits
- 25
- Reported job value
- $1.2M
- Active
- 2020–2025
- Latest permit
- Dec 31, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Glastonbury town, CT10
- Stonington town, CT6
- Bristol town, CT2
- Lebanon town, CT2
- Norwich town, CT2
- Enfield town, CT1
- South Windsor town, CT1
- Winchester town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2021 | 1 |
| 2022 | 4 |
| 2023 | 5 |
| 2024 | 6 |
| 2025 | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC25
- Heat pumps25
- Plumbing3
- Water heaters3
- Electrical2
Permit types
As the building departments classify them.
- Mechanical Permit13
- Stonington Heating & Cooling Permit6
- Electrical Permit General2
- HVAC/Mechanical Permit2
- A Residential Building Application & One and Two Family Dwelling Only (for apt's or condo use Commercial Bldg)1
- Building Permit (No Trades)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 31, 2025 | HVAC/Mechanical Permit | Installation of a geothermal heating and cooling system which includes ductwork. All geothermal heat pump equipment is installed in the basement mechanical room | Bristol Town | $67,000 |
| Aug 5, 2025 | A Residential Building Application & One and Two Family Dwelling Only (for apt's or condo use Commercial Bldg) | Installation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no equipment | Glastonbury Town | — |
| Aug 5, 2025 | Electrical Permit General | Electical installation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no | Glastonbury Town | $4,000 |
| Jul 31, 2025 | Mechanical Permit | Installation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no equipment | Glastonbury Town | $35,000 |
| Jun 23, 2025 | Electrical Permit General | High votage wiring of geothermal heat pump | Glastonbury Town | $5,000 |
| Jun 23, 2025 | Mechanical Permit | Installation of a geothermal heating and cooling system which includes ductwork. All geothermal heat pump equipment is installed in the basement mechanical room | Glastonbury Town | $56,000 |
| Jan 29, 2025 | Mechanical Permit | Installation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no equipment | Glastonbury Town | $53,000 |
| Jan 14, 2025 | Stonington Heating & Cooling Permit | Installation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no equipment | Stonington Town | $78,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed13
- Active12
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.