Contractor · HVAC

SCOT ROGERS

25 building permits since 2020 in Glastonbury town, CT; Stonington town, CT and Bristol town, CT, across 4 counties — $1,158,200 in reported job value over 24 permits that state one.

Building permits
25
Reported job value
$1.2M
Active
2020–2025
Latest permit
Dec 31, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Glastonbury town, CT10
  • Stonington town, CT6
  • Bristol town, CT2
  • Lebanon town, CT2
  • Norwich town, CT2
  • Enfield town, CT1
  • South Windsor town, CT1
  • Winchester town, CT1

Permits by year

By issue date (application date where there is none).

048
8
202020212022202320242025
View as table
YearPermits
20201
20211
20224
20235
20246
20258

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC25
  • Heat pumps25
  • Plumbing3
  • Water heaters3
  • Electrical2

Permit types

As the building departments classify them.

  • Mechanical Permit13
  • Stonington Heating & Cooling Permit6
  • Electrical Permit General2
  • HVAC/Mechanical Permit2
  • A Residential Building Application & One and Two Family Dwelling Only (for apt's or condo use Commercial Bldg)1
  • Building Permit (No Trades)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 31, 2025HVAC/Mechanical PermitInstallation of a geothermal heating and cooling system which includes ductwork. All geothermal heat pump equipment is installed in the basement mechanical roomBristol Town$67,000
Aug 5, 2025A Residential Building Application & One and Two Family Dwelling Only (for apt's or condo use Commercial Bldg)Installation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no equipment Glastonbury Town—
Aug 5, 2025Electrical Permit GeneralElectical installation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no Glastonbury Town$4,000
Jul 31, 2025Mechanical PermitInstallation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no equipment Glastonbury Town$35,000
Jun 23, 2025Electrical Permit GeneralHigh votage wiring of geothermal heat pumpGlastonbury Town$5,000
Jun 23, 2025Mechanical PermitInstallation of a geothermal heating and cooling system which includes ductwork. All geothermal heat pump equipment is installed in the basement mechanical roomGlastonbury Town$56,000
Jan 29, 2025Mechanical PermitInstallation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no equipment Glastonbury Town$53,000
Jan 14, 2025Stonington Heating & Cooling PermitInstallation of a geothermal heating and cooling system. All geothermal heat pump equipment is installed in the basement mechanical room. There is no equipment Stonington Town$78,000

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Active12

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.