Contractor · Electrical

PURE POWER SOLUTIONS

25 building permits since 2016 in Marin County, CA; San Bernardino County, CA and Hayward city, CA, across 10 counties — $121,000 in reported job value over 9 permits that state one.

Building permits
25
Reported job value
$121K
Active
2016–2026
Latest permit
Jul 10, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Marin County, CA8
  • San Bernardino County, CA4
  • Hayward city, CA2
  • Aliso Viejo city, CA1
  • Monterey County, CA1
  • Riverside County, CA1
  • San Mateo County, CA1
  • Sonoma County, CA1
  • Stanislaus County, CA1
  • Fullerton city, CA1

Permits by year

By issue date (application date where there is none).

01020
19
2016201820232026*
* 2026 is year to date.
View as table
YearPermits
20162
20182
20232
2026 (YTD)19

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical15
  • Solar12
  • Battery storage2
  • Roofing2
  • EV chargers2
  • Remodels1
  • Electric meters1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Electrical15
  • RESIDENTIAL7
  • COMMERCIAL1
  • Roofing1
  • SolarAPP+ Permit for Photovoltaic Systems1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 10, 2026RESIDENTIAL14 Kw Ground-Mount Solar Array With (3) E S SMarin County$15,000
Jun 26, 2026RESIDENTIAL21kw Ground-Mount Solar Array With (5) E S S (Gold House)Marin County$15,000
Mar 25, 2026ElectricalRemoval of e 150a meter panel and relocation one foot over within same wall of (n) 200a meter panelMonterey County$15,000
Mar 2, 2026Electrical125amp panel reconnect for existing ag pump c/s crows landing rdStanislaus County—
Feb 26, 2026ElectricalRemove and reinstall of existing pv solar panels for a house re-roof. Original permit 79499 (filemaker) like for like installation. (11) modules & 1-inverter. NAliso Viejo City—
Feb 23, 2026ElectricalR1 - changed solar array layout, reduced solar stringsWoodside Town—
Feb 16, 2026ElectricalReplace old existing sub panel in the garage with a new sub panel. Like for like. No added load.Hayward City—
Feb 14, 2026ElectricalElectric to spaSan Bernardino County—

Permit status

Where its permits stand, as the departments report them.

  • Active9
  • Not stated8
  • Finaled7
  • Pending payment1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.