Contractor · Electrical
PURE POWER SOLUTIONS
25 building permits since 2016 in Marin County, CA; San Bernardino County, CA and Hayward city, CA, across 10 counties — $121,000 in reported job value over 9 permits that state one.
- Building permits
- 25
- Reported job value
- $121K
- Active
- 2016–2026
- Latest permit
- Jul 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marin County, CA8
- San Bernardino County, CA4
- Hayward city, CA2
- Aliso Viejo city, CA1
- Monterey County, CA1
- Riverside County, CA1
- San Mateo County, CA1
- Sonoma County, CA1
- Stanislaus County, CA1
- Fullerton city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 2 |
| 2018 | 2 |
| 2023 | 2 |
| 2026 (YTD) | 19 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- Solar12
- Battery storage2
- Roofing2
- EV chargers2
- Remodels1
- Electric meters1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Electrical15
- RESIDENTIAL7
- COMMERCIAL1
- Roofing1
- SolarAPP+ Permit for Photovoltaic Systems1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 10, 2026 | RESIDENTIAL | 14 Kw Ground-Mount Solar Array With (3) E S S | Marin County | $15,000 |
| Jun 26, 2026 | RESIDENTIAL | 21kw Ground-Mount Solar Array With (5) E S S (Gold House) | Marin County | $15,000 |
| Mar 25, 2026 | Electrical | Removal of e 150a meter panel and relocation one foot over within same wall of (n) 200a meter panel | Monterey County | $15,000 |
| Mar 2, 2026 | Electrical | 125amp panel reconnect for existing ag pump c/s crows landing rd | Stanislaus County | — |
| Feb 26, 2026 | Electrical | Remove and reinstall of existing pv solar panels for a house re-roof. Original permit 79499 (filemaker) like for like installation. (11) modules & 1-inverter. N | Aliso Viejo City | — |
| Feb 23, 2026 | Electrical | R1 - changed solar array layout, reduced solar strings | Woodside Town | — |
| Feb 16, 2026 | Electrical | Replace old existing sub panel in the garage with a new sub panel. Like for like. No added load. | Hayward City | — |
| Feb 14, 2026 | Electrical | Electric to spa | San Bernardino County | — |
Permit status
Where its permits stand, as the departments report them.
- Active9
- Not stated8
- Finaled7
- Pending payment1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.