Contractor · Specialty (solar, fire, telecom)

Peligro Electric Inc.

25 building permits since 2025 in Mesquite city, NV.

Building permits
25
Reported job value
—
Active
2025
Latest permit
Jul 15, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Mesquite city, NV25

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar25

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 15, 2025—ROOF TOP SOLAR INSTALLATION SYSTEM SIZE: 9.35kWh (22) GSTAR 45W Panels (11) APS DS3 Micro-Inverters (1) APSTORAGE PCS ELS-11.4 (11400VA) (1) APBATTERY-51.2V/10.Mesquite City—
Jul 15, 2025—CAR PORT SOLAR INSTALLATION SYSTEM SIZE: 2.975 kWh (7) GSTAR 45W Panels (4) APS DS3 Micro-InvertersMesquite City—
Jul 15, 2025—CAR PORT SOLAR INSTALLATION SYSTEM SIZE: 2.975 kWh (7) GSTAR 45W Panels (4) APS DS3 Micro-InvertersMesquite City—
Jul 15, 2025—CAR PORT SOLAR INSTALLATION SYSTEM SIZE: 2.975 kWh (7) GSTAR 45W Panels (4) APS DS3 Micro-InvertersMesquite City—
Jul 15, 2025—CAR PORT SOLAR INSTALLATION SYSTEM SIZE: 2.975 kWh (7) GSTAR 45W Panels (4) APS DS3 Micro-InvertersMesquite City—
Jul 15, 2025—CAR PORT SOLAR INSTALLATION SYSTEM SIZE: 2.975 kWh (7) GSTAR 45W Panels (4) APS DS3 Micro-InvertersMesquite City—
Jul 15, 2025—CAR PORT SOLAR INSTALLATION SYSTEM SIZE: 2.975 kWh (7) GSTAR 45W Panels (4) APS DS3 Micro-InvertersMesquite City—
Jul 15, 2025—CAR PORT SOLAR INSTALLATION SYSTEM SIZE: 2.975 kWh (7) GSTAR 45W Panels (4) APS DS3 Micro-InvertersMesquite City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.