Contractor · Specialty (solar, fire, telecom)

MC Solar Engineering

25 building permits since 2000 in Los Altos Hills town, CA; Santa Cruz city, CA and Santa Cruz County, CA, across 2 counties — $133,181 in reported job value over 7 permits that state one.

Building permits
25
Reported job value
$133.2K
Active
2000–2007
Latest permit
Mar 22, 2007

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Altos Hills town, CA9
  • Santa Cruz city, CA9
  • Santa Cruz County, CA7

Permits by year

By issue date (application date where there is none).

048
7
2000200320052007
View as table
YearPermits
20001
20022
20033
20047
20054
20066
20072

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar17
  • Electrical9
  • Roofing5
  • Accessory dwelling units1
  • HVAC1
  • Additions1
  • Plumbing1

Permit types

As the building departments classify them.

  • Other8
  • PV & ES Systems8
  • Building7
  • Electrical1
  • Electrical, Mechanical, Plumbi...1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 22, 2007BuildingInstall a roof mounted photovoltaic electrical system on an existing SFD. Building inspector may require plans or modification to roof structure if necessary toSanta Cruz County—
Feb 8, 2007Other—Los Altos Hills Town—
Nov 22, 2006PV & ES SystemsINSTALL ROOF PV ARRAYSanta Cruz City$15,000
Nov 16, 2006BuildingEL: Install a flush mounted solar photovoltaic system to the roof of an existing SFD. Inspector may require plans or roof modifications for the enctreased load.Santa Cruz County—
Oct 26, 2006PV & ES SystemsROOF TOP P.V. ARRAYSanta Cruz City$21,710
Aug 17, 2006Other—Los Altos Hills Town—
Feb 6, 2006PV & ES SystemsSOLAR VOLTAIC SYSTEMSanta Cruz City$24,471
Feb 2, 2006BuildingEL: Install a roof mounted solar photovoltiac system to an existing barn. Inspector may require roof modifications or structual plans to support addition loads.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Not stated9
  • Void3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.