Contractor · Specialty (solar, fire, telecom)
MC Solar Engineering
25 building permits since 2000 in Los Altos Hills town, CA; Santa Cruz city, CA and Santa Cruz County, CA, across 2 counties — $133,181 in reported job value over 7 permits that state one.
- Building permits
- 25
- Reported job value
- $133.2K
- Active
- 2000–2007
- Latest permit
- Mar 22, 2007
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Altos Hills town, CA9
- Santa Cruz city, CA9
- Santa Cruz County, CA7
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2000 | 1 |
| 2002 | 2 |
| 2003 | 3 |
| 2004 | 7 |
| 2005 | 4 |
| 2006 | 6 |
| 2007 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar17
- Electrical9
- Roofing5
- Accessory dwelling units1
- HVAC1
- Additions1
- Plumbing1
Permit types
As the building departments classify them.
- Other8
- PV & ES Systems8
- Building7
- Electrical1
- Electrical, Mechanical, Plumbi...1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 22, 2007 | Building | Install a roof mounted photovoltaic electrical system on an existing SFD. Building inspector may require plans or modification to roof structure if necessary to | Santa Cruz County | — |
| Feb 8, 2007 | Other | — | Los Altos Hills Town | — |
| Nov 22, 2006 | PV & ES Systems | INSTALL ROOF PV ARRAY | Santa Cruz City | $15,000 |
| Nov 16, 2006 | Building | EL: Install a flush mounted solar photovoltaic system to the roof of an existing SFD. Inspector may require plans or roof modifications for the enctreased load. | Santa Cruz County | — |
| Oct 26, 2006 | PV & ES Systems | ROOF TOP P.V. ARRAY | Santa Cruz City | $21,710 |
| Aug 17, 2006 | Other | — | Los Altos Hills Town | — |
| Feb 6, 2006 | PV & ES Systems | SOLAR VOLTAIC SYSTEM | Santa Cruz City | $24,471 |
| Feb 2, 2006 | Building | EL: Install a roof mounted solar photovoltiac system to an existing barn. Inspector may require roof modifications or structual plans to support addition loads. | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed13
- Not stated9
- Void3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.