Contractor · General building

JRP CONSTRUCTION

25 building permits since 2021 in San Pablo city, CA; Sacramento city, CA and Citrus Heights city, CA, across 3 counties — $971,385 in reported job value over 22 permits that state one.

Building permits
25
Reported job value
$971.4K
Active
2021–2026
Latest permit
Sep 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Pablo city, CA10
  • Sacramento city, CA7
  • Citrus Heights city, CA4
  • Sacramento County, CA3
  • Davis city, CA1

Permits by year

By issue date (application date where there is none).

07.515
11
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20211
20223
20231
202411
20258
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels8
  • Electrical6
  • Bathrooms5
  • Accessory dwelling units4
  • Kitchens3
  • Roofing3
  • Demolition3
  • Windows & doors3
  • Gas2
  • Additions2

Permit types

As the building departments classify them.

  • Single Family6
  • BUILDING/REMODEL3
  • Patio Cover3
  • BUILDING/RH&S COMPLIANCE2
  • Addition1
  • BUILDING/ALTERATION1
  • BUILDING/WINDOWS1
  • CBAR1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 29, 2026BUILDING/REMODEL1 plus 1/2 bath remodel and kitchen countertopsSan Pablo City—
Oct 13, 2025DuplexRoof Permit: Tear off and install 19 squares of 30 yr laminated dimensional composition roofing material. In-progress inspection required if 10 sq or greater. CSacramento$15,000
Jun 20, 2025CBNRADD 143 SQ.FT. (13'X11') TO REMODEL BEDROOM 2 AND CONVERT IT TO A MASTER BEDROOM THAT INCLUDES A WALK IN CLOSET AND A FULL BATHROOM. UPGRADE ONE WINDOW ON BEDROSacramento County$44,256
Jun 2, 2025BUILDING/ALTERATIONRe wire house to code, MPU 200A, new sub panel, drywallSan Pablo City$16,000
Mar 15, 2025CBARGarage conversion to Jr.ADU; +/- 11 SqFt of converted area to be utility closet for primary; Panel upgrade to 200ASacramento County$47,420
Feb 10, 2025Single FamilyEPC - SHELF READY ADU - 559 sq ft, porch 32 sq ft 9 sq ft utility room. Solar exempt. 1 bed/1bath. Demolition of the existing garage will be on a separate permiSacramento$150,000
Feb 3, 2025PLUMBING/WATER HEATERGas water heater replacement. 38-gallon, located in garageSan Pablo City$1,500
Jan 27, 2025Single FamilyEPC - CONSTRUCTION OF A NEW 605 SQ FT ADU. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION. SESacramento$150,000

Permit status

Where its permits stand, as the departments report them.

  • Finaled9
  • Issued8
  • Cancelled4
  • Active2
  • Expired1
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.