Contractor · Electrical
HUNTS ELECTRICAL SERVICES
25 building permits since 2024 in Sacramento County, CA; Sacramento city, CA and Elk Grove city, CA, across 3 counties — $70,509 in reported job value over 23 permits that state one.
- Building permits
- 25
- Reported job value
- $70.5K
- Active
- 2024–2026
- Latest permit
- Sep 23, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA11
- Sacramento city, CA8
- Elk Grove city, CA3
- Placer County, CA1
- Lodi city, CA1
- Stockton city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 3 |
| 2025 | 12 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical24
- EV chargers5
- HVAC4
- Plumbing4
- Electric meters4
- Remodels1
- New construction1
Permit types
As the building departments classify them.
- Single Family8
- PANR5
- MISR3
- Electrical2
- MISC2
- CBRC1
- ELECTRICAL1
- EQUIPMENT ELECTRICAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 23, 2026 | MISR | Installation of 2 new House circuits: 30 Amp 10-3 Dryer Circuit & 60 Amp 6-2 EV Charger Circuit; 200 Amp Main Panel exists on property; | Sacramento County | $2,561 |
| Sep 9, 2026 | EQUIPMENT ELECTRICAL | EV Charger and Meter | Lodi | $1,366 |
| Aug 31, 2026 | MISC | Remove unused conductors from panels, provide KO seals as necessary, provide panel blanks where necessary and update panel schedules. Verify overcurrent protect | Sacramento County | $2,000 |
| Jun 23, 2026 | MISC | Re-Wire and Reconnection of Service Feed Wire for Building; Service Feed is for 400 Amps; also installation of 2 secondary 100 amp Main Meter Panels on the Gutt | Sacramento County | $12,000 |
| Mar 31, 2026 | Electrical | Electrical panel c/o like for like same location current panel amperage: 200 proposed panel amperage: 200 change out / new: change out - like for like | Placer County | — |
| Feb 23, 2026 | Single Family | E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement. | Sacramento | $3,561 |
| Feb 12, 2026 | Electrical | E-permit: applicant's detailed description: installation of new 50 amo breaker & circuit for a tesla charger wihtin the garage; will be ran with no.6 thhn; exis | Stockton City | — |
| Feb 12, 2026 | PANR | Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Removal of 100 Amp | Sacramento County | $4,223 |
Permit status
Where its permits stand, as the departments report them.
- Issued14
- Finaled4
- Closed3
- Completed2
- Active1
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.