Contractor · Electrical
ELEOS ELECTRIC
25 building permits since 2026 in Santa Rosa city, CA.
- Building permits
- 25
- Reported job value
- —
- Active
- 2026
- Latest permit
- Mar 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Santa Rosa city, CA25
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical25
- Electric meters15
- Gas2
Permit types
As the building departments classify them.
- Electrical25
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 19, 2026 | Electrical | Remove and replace 100a zinsco meter main with 100a eaton meter main. | Santa Rosa City | — |
| Mar 19, 2026 | Electrical | Remove and replace 100a zinsco meter main and replace with 100a eaton meter main. | Santa Rosa City | — |
| Mar 6, 2026 | Electrical | Remove and replace 100a zinsco meter main with 100a eaton meter main. Perform bonding & grounding, and install surge protection. | Santa Rosa City | — |
| Mar 6, 2026 | Electrical | Units 54 and 56 - remove and replace 100a zinsco sub panel in closet. Flip 180 deg in adjacent hallway and install 100a eaton sub panel and breaker. | Santa Rosa City | — |
| Mar 5, 2026 | Electrical | Remove and replace 200a zinsco panel and install 200a eaton panel and breakers. Install surge protection and perform bonding and grounding. | Santa Rosa City | — |
| Mar 4, 2026 | Electrical | Remove and replace 100a zinsco sub panel in closet and flip 180deg to adjacent wall to meet working space requirements. Install 100a eaton sub panel. | Santa Rosa City | — |
| Mar 4, 2026 | Electrical | Use existing 100a zinsco sub panel in closet as juntion box and relocate circuits to new sub panel location in nearby hallway. Install eaton 100a sub panel and | Santa Rosa City | — |
| Feb 27, 2026 | Electrical | Remove and replace 100a zinsco sub panel in closet. Install 100a eaton sub panel and surge protector facing into adjacent hall to meet working space requirement | Santa Rosa City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled24
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.