Contractor · Electrical

DIVINE ELECTRIC AND PLUMBING

25 building permits since 2026 in Novato city, CA; Mill Valley city, CA and Corte Madera town, CA.

Building permits
25
Reported job value
—
Active
2026
Latest permit
Mar 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Novato city, CA13
  • Mill Valley city, CA5
  • Corte Madera town, CA2
  • Ross town, CA2
  • Tiburon town, CA2
  • Larkspur city, CA1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical25
  • EV chargers7
  • Solar1
  • Generators1
  • Electric meters1
  • New construction1

Permit types

As the building departments classify them.

  • Electrical25

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 25, 2026ElectricalSub panel replacement and relocationLarkspur City—
Mar 19, 2026ElectricalResidential install main electric service and sub-panelMill Valley City—
Mar 13, 2026ElectricalReplace existing 125 amp main service panel (msp)Mill Valley City—
Mar 10, 2026ElectricalReplace existing 125 amp main service panel (msp) with new 125 amp msp in the existing msp location. Install includes new grounding and bonding system as well aNovato City—
Mar 10, 2026ElectricalInstall new 100a sub panel on the wall adjascent to the bedroom approx. 6' to the left of the existing 100a sub panel. All circuits to be relocated to the new pNovato City—
Mar 9, 2026ElectricalInstall new subpanel behind existing msp and install new ev outlet in garage. (wui)Corte Madera Town—
Mar 3, 2026ElectricalReplace and relocate existing zinsco sub panel from inside the closet to outside the closet in the bedroom and relocate all existing circuits from existing locaNovato City—
Mar 3, 2026ElectricalRe-feed all outlets and switches. New home-runs from subRoss Town—

Permit status

Where its permits stand, as the departments report them.

  • Finaled20
  • Active5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.