Contractor · General building
CUSTOM PLG & HTG CO
25 building permits since 2021 in Howard County, MD.
- Building permits
- 25
- Reported job value
- —
- Active
- 2021–2024
- Latest permit
- Aug 6, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD25
Permits by year
By issue date (application date where there is none).
0510
9
2021202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 9 |
| 2022 | 6 |
| 2023 | 8 |
| 2024 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing25
- Remodels20
- Additions20
- Gas14
- Bathrooms10
- HVAC2
- Kitchens2
- Water heaters2
- Pools & hot tubs2
- Electrical1
Permit types
As the building departments classify them.
- Residential Plumbing Addition Alteration Permit20
- Express Plumbing Permit4
- Residential New Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 6, 2024 | Residential Plumbing Addition Alteration Permit | SFD/Gas line to pool heater and barbecue. Polyethylene in yard out back, 1" to pool heater then 3\4" from pool heater to barbecue. 1" CSST line from inside fron | Howard County | — |
| Jul 16, 2024 | Residential Plumbing Addition Alteration Permit | Basement rough in only for 3- piece bathroom. Rough in and install 1-laundry sink, 1-sewage pit and pump, 1-sump pump, 1-floor drain, 1 -tankless hot water heat | Howard County | — |
| Dec 5, 2023 | Residential Plumbing Addition Alteration Permit | Remodel kitchen, lower level bath, main level bath, laundry room. Add master bath to addition and laundry room. FIXTURES: Basement 1 electric water heater, 1 ba | Howard County | — |
| Dec 4, 2023 | Residential Plumbing Addition Alteration Permit | NOV/Basement run gas line to new furnace.(SEE CP230800) | Howard County | — |
| Aug 21, 2023 | Express Plumbing Permit | 3rd Floor Master Bath, replace in same location 1- toilet, 1-lav, 1- shower, and 1-tub. | Howard County | — |
| Aug 21, 2023 | Residential Plumbing Addition Alteration Permit | Run 1/2' gas line to new fireplace installed by others. | Howard County | — |
| Jul 26, 2023 | Residential Plumbing Addition Alteration Permit | Basement bath addition, 1- toilet, 1-lav, 1-shower, and 1- washer box | Howard County | — |
| Jul 11, 2023 | Residential Plumbing Addition Alteration Permit | Pool house, add toilet, lav, sewage pit and pump, hose bib | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed23
- Issued1
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.