Contractor · Specialty (solar, fire, telecom)

SEACLIFF HIGHLANDS ASSOCIATES

26 building permits since 2005 in Santa Cruz County, CA.

Building permits
26
Reported job value
—
Active
2005–2025
Latest permit
Sep 9, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA26

Permits by year

By issue date (application date where there is none).

0510
9
20052006201320242025
View as table
YearPermits
20052
20069
20131
20246
20258

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar10
  • Roofing8
  • Electric meters3
  • Grading & excavation2
  • Electrical2
  • Gas1
  • Battery storage1
  • EV chargers1

Permit types

As the building departments classify them.

  • Building26

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 9, 2025BuildingReplace (20) existing streetlight poles with hybrid poles of maximum 15' height from grade at existing multifamily residential complex. Hybrid poles include lowSanta Cruz County—
Apr 10, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing multifamily structure <600 sq ft, install new sheathing as required with Santa Cruz County—
Feb 27, 2025BuildingBuilding B, Units 811-814 Note state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure install new sheathing as required witSanta Cruz County—
Feb 27, 2025BuildingBuilding I, Units 611-614 Note state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure install new sheathing as required witSanta Cruz County—
Feb 27, 2025BuildingBuilding A, Units 711-715 Note state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure install new sheathing as required witSanta Cruz County—
Jan 23, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
Jan 23, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
Jan 23, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed23
  • Active2
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.