Contractor · Plumbing
SAMUEL HAZLETT
26 building permits since 2019 in Buffalo city, NY and Clarence town, NY — $250,450 in reported job value over 26 permits that state one.
- Building permits
- 26
- Reported job value
- $250.5K
- Active
- 2019–2026
- Latest permit
- Aug 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY25
- Clarence town, NY1
Permits by year
By issue date (application date where there is none).
036
6
2020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 2 |
| 2020 | 2 |
| 2021 | 2 |
| 2022 | 2 |
| 2023 | 6 |
| 2024 | 4 |
| 2025 | 5 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing26
- Bathrooms9
- Kitchens6
- Remodels3
- Gas2
- Grading & excavation2
- Water heaters2
Permit types
As the building departments classify them.
- PLUMBING25
- Plumbing (Res. SGL R+R)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 24, 2026 | PLUMBING | Install hung sewer in basement. Collect two dowspouts outside of house. Run new sewer lateral down driveway and connect near existing main sewer tap. | Buffalo City | $20,000 |
| Mar 31, 2026 | PLUMBING | Install hung sewer inside house. Re route exterior sewer. | Buffalo City | $13,000 |
| Mar 9, 2026 | PLUMBING | Repair sewer line is compromised. | Buffalo City | $6,500 |
| Dec 15, 2025 | PLUMBING | Installing new plumbing as needed for bathroom remodel. Freestanding tub, shower, lav and toilet. | Buffalo City | $5,700 |
| Nov 24, 2025 | PLUMBING | Replace Galvanized water lines in basement. 40 Gallon water heater replacement. Install finish fixtures for kitchen remodel. | Buffalo City | $5,000 |
| Sep 23, 2025 | PLUMBING | Plumbing ran to new bathroom layout on first and second floor. Total of 8 fixtures. Cleanup plumbing for the kitchen. | Buffalo City | $16,000 |
| Jul 16, 2025 | PLUMBING | Rough water and drain for gut/flip house. Connect to existing water and sewer taps that are already stubbed into/nearby building. | Buffalo City | $18,000 |
| May 19, 2025 | PLUMBING | Replacing water galvanized water lines from the meter to all first floor fixtures. New water lines to second floor kitchen. Existing water to 2nd floor bath is | Buffalo City | $6,700 |