Contractor · Specialty (solar, fire, telecom)

QUALITY TELECOM

26 building permits since 2007 in Kings County, CA; Mountain View city, CA and Sacramento County, CA, across 8 counties — $2,257,000 in reported job value over 24 permits that state one.

Building permits
26
Reported job value
$2.3M
Active
2007–2026
Latest permit
Aug 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Kings County, CA9
  • Mountain View city, CA7
  • Sacramento County, CA4
  • Madera city, CA2
  • Alturas city, CA1
  • Merced city, CA1
  • San Bruno city, CA1
  • Santa Cruz city, CA1

Permits by year

By issue date (application date where there is none).

036
6
20072015201820212026*
* 2026 is year to date.
View as table
YearPermits
20071
20101
20142
20153
20162
20171
20182
20192
20202
20212
20226
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Telecom17
  • Generators8
  • Remodels5
  • Electrical2
  • Gas1
  • Battery storage1
  • Demolition1
  • EV chargers1
  • Electric meters1

Permit types

As the building departments classify them.

  • 3295
  • BL, EL, CH5
  • CBNC3
  • 4372
  • CELL TOWER2
  • MISC2
  • 00 OVER THE COUNTER PERMITS/MISC1
  • 5021

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 24, 2026502NEW COM ELECT EV CHARGING FACILITYKings County$500,000
Jan 17, 2025CELL TOWERCELL SITE IMPROVEMENTSMadera City$150,000
Nov 16, 2022CBNCInstallation of an 80kW, 466-gallon diesel powered emergency backup generator on new concrete pad, with automatic transfer switch, auxiliary power distribution,Sacramento County$50,000
Aug 24, 2022CBNCTHE PROPOSED PROJECT INSTALLS AN OPTIONAL STANDBY GENERATOR SYSTEM ON A CONCRETE PAD, AUTOMATIC TRANSFER SWITCH, GENERATOR AUXILIARY POWER DISTRIBUTION, AND REMSacramento County$35,000
Jul 20, 2022CELL TOWERCELL SITE MODIFICATIONS ADDING BACK-UP GENERATORMadera City$30,000
Mar 8, 2022MISCREPLACE ANTENNAS - TMOBILEKings County$20,000
Jan 19, 2022CBNCTHE PROPOSED PROJECT INSTALLS AN OPTIONAL STANDBY 80KW GENERATOR SYSTEM, AUTOMATIC TRANSFER SWITCH, GENERATOR AUXILIARY POWER DISTRIBUTION, AND REMOTE MONITORINSacramento County$35,000
Jan 13, 2022MISCRemove 100A power pedestal and sub panel, install 200A PPC, upgrade 100A meter main with a 200A meter main, and replace power conductors.Sacramento County$25,000

Permit status

Where its permits stand, as the departments report them.

  • Not stated16
  • Completed5
  • Issued3
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.